Browse
Search
Agenda - 05-26-2005-1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 05-26-2005
>
Agenda - 05-26-2005-1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 8:19:46 PM
Creation date
8/29/2008 10:28:04 AM
Metadata
Fields
Template:
BOCC
Date
5/26/2005
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes - 20050526
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Space Needs Report--2005 Update <br />Page 22 of 69 <br />Department Name: Board of Elections (BOE) <br />Project Development Phase: Interim: Tier 1 B or Tier 2A; Long-Term: Tier 3B <br />Current Location: Court Street Annex, <br />Current Departmental Square Footage: 1,007 <br />Current # Employees: 4 <br />Proposed Square Footage: 3,055 (plus 30% Circulation factor) <br />Options to accommodate space <br />Interim: Two opticns exist far interim space, contingent upon the <br />development timeline for the new county campus. <br />o Department will expand within existing space at such time the <br />Phase I Justice project is completed and EDC is relocated to the <br />old Hillsborough Savings Bank Building, estimated in 2008; or <br />o Department will relocate from the Court Street Annex to the GSC at <br />such time a building suitable for all land related departments is built <br />at the new county campus. The Court Street Annex would then be <br />reallocated entirely for court operations. <br />o The decision regarding which option to pursue may be different <br />contingent upon decisions made about other projects contained in <br />this study. Consider the following: <br />^ If the GSC land departments are tc move to the new campus <br />in a later phase of development, then the BOE should <br />expand within the Court Street Annex after EDC has been <br />relocated. <br />^ If the proposed Land Services Building is completed in a <br />' single phase then it may be more practical to relocate BOE <br />to the GSC and reassign the Court Street Annex to the court <br />system (Probation and Parole and Juvenile Services occupy <br />the upper floor of the building currently). This option should <br />be evaluated further in light of current conditions at the time <br />of relocation to ensure the program defined for the <br />departments relocating from GSCA allows sufficient space <br />for the BOE move. <br />Long-term: Department would be Iccated with other County administrative <br />functions to the new county campus. <br />3 <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.