Browse
Search
Agenda - 8-d - Award of Emergency Services Stand-Alone Efland Station Professional Services Agreement
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2019
>
Agenda - 05-21-19
>
Agenda - 8-d - Award of Emergency Services Stand-Alone Efland Station Professional Services Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2019 6:26:26 PM
Creation date
5/16/2019 6:07:06 PM
Metadata
Fields
Template:
BOCC
Date
5/21/2019
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Agenda - 05-21-19 Regular Board Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2019\Agenda - 05-21-19
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> 3.2.2 The Designer shall be responsible for all errors or omissions, in the drawings, specifications, and <br /> other documents prepared by the Designer or its Consultants. It shall be the responsibility of the Designer <br /> throughout the period of performance under this Agreement to use reasonable professional care and <br /> judgment to guard the Owner against defects and deficiencies in the Project. <br /> 3.2.3 The Designer shall correct at no additional cost to the Owner any and all errors, omissions, <br /> discrepancies, ambiguities, mistakes or conflicts in the drawings,specifications and other documents <br /> prepared by the Designer or its Consultants. <br /> 3.2.4 All drawings, specifications and other documents prepared by the Designer or its Consultants <br /> hereunder shall be a-Fe in accordance with applicable laws, statutes, building codes and regulations and that <br /> all necessary or appropriate applications for approvals are submitted to federal, state and local <br /> governments or agencies in a timely manner so as not to delay the design or construction activities of the <br /> Project as per the Standard of Care. All elements of this subsection shall be met with the Standard of Care <br /> as described in subsection 3.2.1. <br /> 3.2.5 The Designer and its Consultants shall perform all services in a reasonably timely manner in <br /> accordance with all mutually agreed schedules for the Project or required under this Agreement, and as <br /> provided in the construction agreement and any General Conditions of the Owner's construction <br /> agreements with the contractors for the Project. <br /> 3.2.6 The Designer shall reimburse the Owner, as stipulated in 3.2.6.A and 3.2.6.13 for costs, damages and <br /> expenses, including attorney's fees, incurred by the Owner when such costs, damages and expenses are the <br /> result of any negligent error,omission or delay of the Designer or its Consultants. <br /> 3.3 Designer's Consultants <br /> 3.3.1 The Designer's Consultants for the project, along with their key project personnel,are listed in <br /> Attachment E to this Agreement. No changes in the Consultants or key personnel indicated shall be <br /> permitted except with the prior written consent of the Owner. <br /> 3.3.2 All of the Designer's contracts with its Consultants shall be in writing and shall expressly provide <br /> that if this Agreement is terminated for any reason,the Owner may, at its sole option,take the assignment <br /> of the Consultants' contract with the Designer,that such assignment shall automatically take place upon <br /> notification in writing by the Owner to the Consultants and the Consultants shall continue to be bound by <br /> the contract after such assignment.A copy of each contract between the Designer and a Consultant shall be <br /> furnished to the Owner within seven (7) days of its execution. <br /> ARTICLE 4 <br /> BASIC SERVICES <br /> 4.1 Basic Services <br /> 4.1.1 The Designer shall perform as Basic Services the work and services described herein and in <br /> Attachment B to this Agreement. <br /> 4.1.2 The Basic Services will be performed by the Designer in the phases described in Attachment B. <br /> 4.1.3 The Owner shall have the right and option to require the Designer to prepare one separate bid <br /> packages at the cost identified in Section 7.2.7. Such bid packages must be approved by Owner prior to <br /> submission and, at the Owner's option, may include but not be limited to: <br />
The URL can be used to link to this page
Your browser does not support the video tag.