Browse
Search
Agenda - 8-d - Award of Emergency Services Stand-Alone Efland Station Professional Services Agreement
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2019
>
Agenda - 05-21-19
>
Agenda - 8-d - Award of Emergency Services Stand-Alone Efland Station Professional Services Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2019 6:26:26 PM
Creation date
5/16/2019 6:07:06 PM
Metadata
Fields
Template:
BOCC
Date
5/21/2019
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Agenda - 05-21-19 Regular Board Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2019\Agenda - 05-21-19
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
23 <br /> 5 <br /> Exclusions: <br /> - No testing of existing structure is included to determine existing masonry <br /> reinforcement placement. This, if needed, will be provided by the owner. <br /> The design team will assist the owner in acquiring these services. <br /> - No surveying or geotechnical exploration is included; however, the design <br /> team will assist the owner with acquiring these services, if requested. <br /> - The facility will not be LEED certified and therefore no LEED design or <br /> certification services are included. <br /> The civil engineering design is based upon the assumption that due to the size of the <br /> facility and project that no Stormwater Management design or erosion control <br /> permit will be required. With this assumption, the fee includes design of required <br /> erosion control measures for the contractor during construction. As an add alternate <br /> to the fee proposal, if needed, we will include stormwater management design and <br /> calculations for an additional fee as stated below. Similarly, due to the minimal site <br /> work being proposed, it is our hope that landscape improvements beyond re- <br /> grassing will not be required. A fee to add this cost is also stated below. At the <br /> request of the County we are also providing an add fee alternate for providing the <br /> design of a roughly 60 kw roof top photovoltaic system. Lastly, the county has <br /> requested a fee for an add if the county decides to split the project so that it would <br /> be bid as 2 projects. This additional fee is also included below. <br /> Additional add alternate fee items: <br /> 1. Stormwater Management Design $8,000 <br /> 2. Landscape Design 2,000 <br /> 3. Design of roughly 60kw solar sys. 5,200 <br /> 4. Additional Bid Package 16,500 <br /> Our proposed schedule for the project is: <br /> Schematic Design: June3 - July 18 <br /> Design Development: July 19 - Sept 2 <br /> Construction Drawings: Sept 3 - Dec 2 <br /> Permit Review: Dec 3 Jan 3, 2020 <br /> Bidding: Jan 7—Feb 4 <br /> County Approval/Contracts: Feb 4—Mar 4 <br /> Construction Administration: March—Dec <br /> Closeout/Occupancy: Jan 2021 <br /> We look forward to serving the County on this important project. Please let me <br /> know if you have any questions regarding this proposal or would like any additional <br /> information. <br /> Z- <br /> PLANNING <br /> ARCHITECTURE <br /> JJao, AIA, LEED-AP BD+C <br /> INTERIORS <br /> 2 <br /> CONSULTING <br />
The URL can be used to link to this page
Your browser does not support the video tag.