Orange County NC Website
19 <br /> Attachment B—Description of Basic Services <br /> -Standard Architectural,Civil, Structural, Plumbing, Mechanical, and Electrical Design for a renovation <br /> project. <br /> -Telecom and Data system pathway infrastructure and coordination with county vendors is included; <br /> however,design of voice and data cabling and systems is not. <br /> -Standard Fire Protection Design <br /> -A construction period of 12 months is assumed for construction administration purposes. <br />