Browse
Search
Agenda - 6-b - Comments on the Draft FY20 Work Plan for Orange County Transit Services and Approval of Participation in a Commuter Rail Feasibility Study
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2019
>
Agenda - 05-21-19
>
Agenda - 6-b - Comments on the Draft FY20 Work Plan for Orange County Transit Services and Approval of Participation in a Commuter Rail Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2019 6:18:00 PM
Creation date
5/16/2019 6:05:50 PM
Metadata
Fields
Template:
BOCC
Date
5/21/2019
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Agenda - 05-21-19 Regular Board Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2019\Agenda - 05-21-19
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13 <br /> Adminstration <br /> The Durham-Chapel Hill-Carrboro Metropolitan Planning Organization (DCHC MPO), which hosts the <br /> administrative functions of the Staff Working Groups (SWG), requested that the previously half-time <br /> position of SWG Administrator be upgraded to full time to reflect the amount of time and effort actually <br /> required to perform the duties.The Orange County Transit Tax District would pay for half of this position, in <br /> accordance with previous custom to split the position evenly between Durham and Orange counties. In <br /> addition,two positions are identified that are housed at GoTriangle:the Triangle Tax District Administrator <br /> and a Tax District Administrative Assistant.These positions were previously embedded within the functions <br /> of the Durham-Orange Light Rail Transit(D-0 LRT) project, but since these are necessary administrative <br /> functions with our without D-O LRT,the FY20 Work Plan calls them out specifically for funding.The cost for <br /> the Triangle Tax District Administrator is split evenly between Durham and Orange counties(same as for the <br /> SWG Administrator).The Tax District Administrative Assistant is split between three counties: half of the <br /> cost is paid by Wake County, and one-quarter each by Durham and Orange counties. <br /> Services <br /> Orange Public Transit (OPT) will provide increased or new service on four routes in FY20: <br /> • The Alamance Health Connector Service to Mebane <br /> • A new Cedar Grove-Durham Express <br /> • Expansion of service hours for the Hillsborough Circulator, including new counter-circulator <br /> service <br /> • Increased service for mobility on demand <br /> Capital <br /> Capital expenditures in FY20 will be primarily directed towards bus stop improvements. Chapel Hill Transit <br /> will upgrade stops to be ADA compliant, part of an effort to eventually upgrade 602 bus stops throughout <br /> their service area. GoTriangle will upgrade two stops in Carrboro along Rogers Road and one in Mebane. <br /> Several other bus stops throughout Orange County will also be improved. In addition to these bus stop <br /> improvements, construction of the Hillsborough Train Station is expected to progress in FY20, and funds <br /> are available through the Orange County Work Plan to complete that project. <br /> Work on the N-S BRT in Chapel Hill will continue into FY20. Prior year funds will be used to bring the project <br /> to project development. <br /> Figure 21 maps the location of these forthcoming service and capital investments (except the Chapel Hill <br /> Transit bus stops). <br /> 1 Map was incomplete at the time of publication for public comment. It will be updated as soon as all location <br /> information is available. <br />
The URL can be used to link to this page
Your browser does not support the video tag.