Orange County NC Website
DocuSign Envelope ID:47205FAF-9CD2-4A40-BD26-FF33C4A659C6 <br /> Orange County E-9-1-1 System <br /> Detailed Statement of Work <br /> • A sufficiently sized ground bus cable between building's main <br /> electrical entrance ground and the communications equipment <br /> room; <br /> • Two (2) dedicated single outlet 20A circuits to each equipment <br /> room, within six (6) cable feet of each VESTA equipment rack. The <br /> termination for these circuits will be with a receptacle TBD and at <br /> location to be specified by MCA. Power should be sourced via <br /> emergency generator-backed uninterruptible power supply ("UPS"); <br /> • One (1) dedicated 15A circuit into two (2) duplex 5-15R receptacles <br /> at each workstation area, at locations specified by MCA. Power <br /> should be sourced via emergency generator-backed uninterruptible <br /> power supply ("UPS"); <br /> • One (1) RS-232 interface cable, terminated into a DB-9 male <br /> connector, from the CAD system for ANI/ALI transfer. Orange <br /> County is also responsible for coordination with CAD vendor for <br /> clarification, testing, and modification (if necessary) of CAD <br /> communications protocols; <br /> • Adequate wall space to mount a finished 4' x 4', 3/4" plywood board <br /> within six feet (6') of each VESTA equipment rack location. <br /> • Provide and/or order the necessary telco facilities, including (but <br /> not limited to): <br /> • West A9-1-1 router; <br /> • Admin circuits. <br /> • The West A9-1-1 Network circuits shall terminate at the VESTA <br /> firewall and be connected to the West A9-1-1 network router <br /> located within six feet (6') of the VESTA equipment rack location. <br /> Admin lines shall terminate on a separate Type-66 block mounted <br /> to the plywood board within six feet (6') of each VESTA equipment <br /> rack location. <br /> • Provide parking for at least two (2) mid-sized vans for equipment <br /> delivery, and one (1) mid-sized service van for the implementation <br /> period; <br /> • Provide MCA personnel with timely and accurate decisions and <br /> responses to requests for technical, operational, and other <br /> information. <br /> 6 <br />