Browse
Search
2019-270-E AMS - Mobile Communications change order request
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-270-E AMS - Mobile Communications change order request
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2019 11:13:53 AM
Creation date
5/13/2019 10:40:44 AM
Metadata
Fields
Template:
Contract
Date
5/7/2019
Contract Starting Date
2/5/2019
Contract Ending Date
7/15/2019
Contract Document Type
Contract Amendment
Amount
-$6,236.25
Document Relationships
2019-093-E AMS - Mobile Communications Vesta
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2019-270 AMS - Mobile Communications change order request
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:47205FAF-9CD2-4A40-BD26-FF33C4A659C6 <br /> Orange County E-9-1-1 System <br /> Detailed Statement of Work <br /> • Schedule and attend monthly or weekly meetings, depending on <br /> the status and progress of the project, during the system <br /> installation, to keep Orange County up to date on the status of the <br /> system installation. <br /> Cutover and Workstation Permanent Installation <br /> After the VESTA 9-1-1 switch has been relocated and network <br /> connectivity has been established and tested, the system will be ready for <br /> cutover. <br /> When all workstations have been installed, the process of testing the 9-1- <br /> 1 trunks, ALI, and administrative lines will occur. <br /> If any major incident or disaster occurs, or at any time as directed by <br /> authorized Orange County personnel, the implementation will stop. If <br /> this occurs during a testing or alignment cycle, MCA technicians will <br /> stabilize the system as quickly as possible and cease operations until <br /> notified by authorized Orange County personnel that implementation <br /> may continue. <br /> Final Acceptance <br /> Once all equipment is installed and working, Orange County will be <br /> invited to submit a "punch list" to MCA of any problems, deficiencies, or <br /> other unsatisfactory conditions. <br /> MCA will commit a time period to resolve all punch list items, and will <br /> act to clear up any identified issues. <br /> Orange County's Responsibilities <br /> The following items are the responsibility of the Orange County, or its <br /> agents: <br /> • Provide a safe work environment in the building for MCA <br /> employees to complete the project. If special equipment is required <br /> to be in the building Orange County will notify MCA; <br /> • Power on all electronic equipment and verify that each item is <br /> operating to its pre-existing condition prior to the infestation of <br /> mold; <br /> • Provide certification that all Vesta 9-1-1 equipment has been <br /> cleansed of all mold; <br /> • All responsibility for the Vesta 9-1-1 equipment during the <br /> sanitation process and storage until the PSAP is ready for <br /> occupation; <br /> • High speed internet (DSL preferred with Static IP address) access <br /> for remote maintenance access; if DSL is PPPoE a router for <br /> authentication will be required; <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.