Browse
Search
2019-270-E AMS - Mobile Communications change order request
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-270-E AMS - Mobile Communications change order request
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2019 11:13:53 AM
Creation date
5/13/2019 10:40:44 AM
Metadata
Fields
Template:
Contract
Date
5/7/2019
Contract Starting Date
2/5/2019
Contract Ending Date
7/15/2019
Contract Document Type
Contract Amendment
Amount
-$6,236.25
Document Relationships
2019-093-E AMS - Mobile Communications Vesta
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2019-270 AMS - Mobile Communications change order request
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:47205FAF-9CD2-4A40-BD26-FF33C4A659C6 <br /> Orange County E-9-1-1 System <br /> Detailed Statement of Work <br /> other interconnected equipment, will be mounted to the board. All <br /> inbound telco circuits will terminate on this board. <br /> Cable management devices (e.g., spools, U-rings) will be installed on the <br /> board to provide clean routing for cabling and jumpers. <br /> VESTA E94-1 Call Taker Workstations <br /> The eleven (11) VESTA Call Taker workstations will be installed in <br /> Orange County's Primary communications center. The system printer will <br /> be configured and connected to the VESTA servers and the VESTA <br /> workstations will be connected to the E-9-1-1 Ethernet network. <br /> Each VESTA workstation computer will be installed at an operator <br /> position and connected to the VESTA switch via the 9-1-1 Ethernet <br /> network. The monitors will be connected via high-quality shielded video <br /> cables to the video port on the computer, and will be set on the desktop. <br /> The audio logging output of the Sound Arbitration Module ("SAM") card <br /> will be connected to the Console Interface Electronics ("CIE") of the radio <br /> dispatch console system to allow concurrent use of the headset for both <br /> telephone and radio operations. Cables will be routed and dressed neatly <br /> and cleanly, in a manner which allows access for service and <br /> maintenance. <br /> GPS Time Standard <br /> The Spectracom NetClock Master Clock will be installed in the Orange <br /> County's communications center equipment room to provide system <br /> timing. <br /> Implementation <br /> The implementation of the Orange County E-9-1-1 system relocation will <br /> be accomplished by MCA factory-trained and experienced technicians. A <br /> project manager will be assigned to the project to provide a single point <br /> of contact for the Orange County, and to schedule and coordinate <br /> activities relevant to the implementation. <br /> Project Management <br /> A project manager will be assigned by MCA to facilitate and oversee the <br /> complete project, and will be a single contact point for Orange County for <br /> all items concerning the implementation of this project. The Project <br /> Manager will provide the following services toward maintaining an <br /> organized and orderly project implementation: <br /> • Inventory of all equipment upon arrival, and deliver equipment <br /> inventory list to the Orange County; <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.