DocuSign Envelope ID:47205FAF-9CD2-4A40-BD26-FF33C4A659C6 <br /> Orange County E-9-1-1 System <br /> Detailed Statement of Work <br /> The VESTA 9-1-1 Call Taker workstations will also be powered off <br /> remotely and removed from the existing console furniture by the <br /> County's sub-contractor. The County sub-contractor will be responsible <br /> for the sanitization process. <br /> The Spectracom NetClock will also be powered off and removed from the <br /> backroom equipment rack by the County's sub-contractor. The NetClock <br /> will also be turned over to the County sub-contractor for the sanitization <br /> process. <br /> VESTA Enhanced 9-1-1 (E-9-1-1) System Re-Installation <br /> Upon notice from Orange County that the Primary PSAP remediation <br /> process and remodeling has been completed MCA will provide the <br /> following installation services. <br /> VESTA E9-1-1 Backroom Equipment <br /> The E9-1-1 equipment rack will be secured to the floor and positioned <br /> such that sufficient space is available around the rack for technicians to <br /> access the equipment and connections mounted to the wall behind the <br /> rack, and a minimum of 36" of clear space will be provided between the <br /> rack and the front of any electrical distribution panel. <br /> Standard 66-type punch blocks will be mounted on a 3/4" plywood <br /> backboard, and will connect to the electronics in the equipment rack via <br /> standard Centronics-type 25-pair cables to provide the interface between <br /> VESTA interfaces and Orange County 's 9-1-1 telco trunks. A single <br /> cable assembly will connect each workstation to the appropriate operator <br /> interface. <br /> The VESTA equipment rack assembly will be installed in Orange <br /> County's primary communications center equipment room. Cabling will <br /> be installed between the FXO and FXS Gateways and their respective <br /> punch blocks. <br /> The 9-1-1 trunk interface modules will be configured and connected to <br /> the West A9-1-1 network router. Preliminary alignment will be <br /> performed on the trunk interfaces to work with connected 9-1-1 trunks. <br /> The computer aided dispatch (CAD) interface from the VESTA will be <br /> configured and connected to the CAD server to verify correct <br /> communications parameters and transmission of ANI/ALI data to the <br /> CAD system. <br /> Punch Blocks <br /> A finished 4' x 4', 3/4" plywood board will be mounted to the wall of the <br /> equipment room, near the planned equipment rack location. The punch <br /> block interfaces for the VESTA system, and additional punch blocks as <br /> needed to provide appropriate industry-standard connection points for <br /> 2 <br />