Orange County NC Website
DocuSign Envelope ID:47205FAF-9CD2-4A40-BD26-FF33C4A659C6 <br /> Orange County E-9-1-1 System <br /> Detailed Statement of Work <br /> Terms and Conditions <br /> The following terms and conditions apply to this project and associated <br /> contract: <br /> A. General <br /> A.1. The "Customer" is the end-user or owner of the equipment affected by this Statement of <br /> Work, and who will receive the direct benefits from the items in this quotation. The <br /> "Client" is the contractor who will provide payment to Mobile Communications America, <br /> Inc. <br /> A.2. This is a non-union Statement of Work. <br /> A.3. Mobile Communications America, Inc. is an Equal Opportunity Employer. <br /> A.4. A Professional Engineer's stamp will not be required by the Customer or Client on any <br /> drawings. <br /> B. Limits to Quotation and Statement of Work <br /> B.1. Pricing is valid only for those items stated within the Statement of Work. Any <br /> modifications to the equipment or the statement of work for the original quote must be re- <br /> negotiated. <br /> B.2. Equipment not described or not stated within this Statement of Work that later requires <br /> installation and maintenance will require an additional quote, and the associated costs will <br /> be borne by Customer or Client. <br /> B.3. Pricing is valid for 90 days from the date of any quote, and will be invalid if the installation <br /> does not commence within six months from the date of the quote. When conditions dictate <br /> an excessive delay in a system installation then a re-negotiated quote may be required. <br /> B.4. Unless specified, this Statement of Work does not include Customer training. <br /> B.S. No additional equipment will be installed, other than that listed on the provided equipment <br /> list or as described in this Statement of Work. <br /> B.6. No costs are included to relocate equipment, other than as specified in the Statement of <br /> Work. The impact of any modifications, improvements, relocations, or enhancements to <br /> the site, to site furniture, or to other equipment, is outside the scope of this Statement of <br /> Work, unless specified. <br /> B.7. This Statement of Work does not include project management, or related tasks (e.g., <br /> inventory, project oversight, engineering, etc.), unless such services are specifically <br /> enumerated in this Statement of Work. <br /> B.B. This Statement of Work does not include any spare or backup equipment or services, <br /> unless specified in the Statement of Work. <br /> C. Site Readiness and Accessibility <br /> C.1. All construction, including painting, flooring, ceiling, wall treatments, electrical, and <br /> plumbing, will be complete prior to commencement of installation activities. <br /> C.2. Mobile Communications America, Inc. will not be responsible for additional trips to <br /> ascertain the status of work by others. Site visits precipitated by indications of site <br /> readiness from either the Customer or Client, where preconditions for installation have not <br /> been met, will be billed to the appropriate party at the prevailing rate. <br /> C.3. Installation areas will be dry, well-lit, clear of debris, and secure from unauthorized <br /> trespass. <br /> CA. Customer will be required to provide on-site parking for at least one Ford "Econoline"type <br /> van. <br /> C.S. Installers are to have free access to all work areas either by keys or a Customer escort to <br /> stay with them at all times. The Customer bears sole responsibility for compensation of <br /> Customer escort(s). <br /> C.6. Statement of Work is based on access to all sites as required by Mobile Communications <br /> America, Inc. and their assigned subcontractor(s). Deviations to the specified site <br /> locations will require revised pricing. <br /> 7 <br />