Browse
Search
2019-261-E AMS - Sasser Soltys remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-261-E AMS - Sasser Soltys remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2019 9:27:31 AM
Creation date
5/6/2019 9:04:13 AM
Metadata
Fields
Template:
Contract
Date
4/25/2019
Contract Starting Date
4/25/2019
Contract Ending Date
6/30/2019
Contract Document Type
Agreement - Construction
Agenda Item
5/2/19; 8-e
Amount
$88,673.00
Document Relationships
Agenda 05-02-2019 - 8-e - Approval of Budget Amendment #8-A for Repair of the Soltys Adult Day Health Space at the Passmore Center
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 05-02-19 Regular Meeting
R 2019-261 AMS - Sasser Companies Soltys remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
#1912 SOLTYS-HILLSBOROUGH <br /> V Y 7, 0 --•----• DENOTES LOCATIONS OF NEW WALL <br /> ul Dw PA � tSP.W,llr Ni I. : <br /> i! _ - .. 1 bbWQL DEMO NQ,EESS: <br /> Plo-s PIS Pis IUNE 1.Demo all existing gypsum hoard and fu rring on studs or CMU in their emlrety. <br /> �� SALON QfIIE"1- PA, I� <br /> yR gtDay,q- I..I 2.Demo all flooring and base In[heir entirely.IF remediation activities will not damage the mdsting <br /> ftwHng and it is cleaned per the remediation protocol,[hen flooring can he remain. <br /> SWARUM <br /> _ <br /> 3.Demo all ceilings and[Ile in the wnrk area In thelr entirety.If remediatipn ac[Ivltles can be <br /> Y' %4 kr ppµ rv6� Fao1Xa I accomplished by only removing a portion of the grid,and the grid is leaned per the protocol,then i[ <br /> Ime PAR71Td1 ;, I Can remain- <br /> ' ton _ -- -, i <br /> nt I I ��".' ti� I 4.Remove and clean all cabinetry as required for remedlatlon work.Cabinetry shell he cleaned per the <br /> PI• <br /> t IN Au I protocol and may requlm trimmingladjustment to fit once flew wall is Installed. <br /> a sroR. I I FITNESS <br /> PtI sIa tv6a 5.Demo a portion of any wails intersecting the new metal stud wall as necessary to complete the new <br /> Mr <br /> stud work and insulation. <br /> EF MTY PD T s <br /> I ,e �1 a .2 G.Install new 3 518'metal stud wall lnstalled to Hoer deck or roof deck above;install deflection trade <br /> C wk7 pR�n 061 tt LOUNGE fCESIG4 at deck to allow For movement. <br /> Ios7 I <br /> .... <br /> pg MO. A9,1 Pro 7,Install:2"continuous dosed cell spray foam insuletlen fDlmelec-Headnk Soy 200 Plus or SWD <br /> '}s ER �1 %D - r? Urethane-Qulk-Shield 11J xq and air harrier wer existing CMU wall as specified between from floor <br /> I a 9 Ip KfI'CHEN It to deck above and between ali studs.Install foam per manufacturer's recommerdatpns. <br /> iiL ' CJ zl Ids Install 1/2'drywall from flnahed floor[o deck above over the new metal stud wall. <br /> r PIG IN, ,� 9.Repair or replace wall at intersecting walls where wall was removed In order to install spray foam. <br /> rT loss �:. <br /> I ES�g� PI6 I c, 10.Install new or repair ceiling grid as necessary based upon demolition and remediation work;Install <br /> 8EG NOL+A1 I new ceiling tiles in grid. <br /> Pic 8 <br /> GENERAL r CORq• 11.Paint wall color and typelsheen as selected by the Owner. <br /> s t• 'AMC Y ns ACT)VflY <br /> Ip a ,— mj0 12.Install new rubber wall base as selected by the Owner. <br /> iRr Ia t G4 f <br /> � i � � 13.Iratall new flooring as selected by the Owner. <br /> H 105111 x I I I L — 14.Relnslall Whinetry. DEOfING AROVE <br /> A&& <br /> C7 ��`3 _ J 91[r SEAL TOP OFF OEFLFCTION <br /> 1C AIT Afdl kay DM �W!! WALL AT DECK TRACK <br /> Il i Aae G4 112"GYP BOAR - <br /> a OVER NEW 35/8" EXISTING CMU <br /> Il Mn STUD WALL WALL <br /> r PLANTER <br /> LL <br /> 2"SPRAY FOAM I <br /> p DAOR INSULATION�g 6 boomerang <br /> EA <br /> TYPL WALL SECTION I I ' , <br /> A AF10PI <br />
The URL can be used to link to this page
Your browser does not support the video tag.