Browse
Search
2019-261-E AMS - Sasser Soltys remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-261-E AMS - Sasser Soltys remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2019 9:27:31 AM
Creation date
5/6/2019 9:04:13 AM
Metadata
Fields
Template:
Contract
Date
4/25/2019
Contract Starting Date
4/25/2019
Contract Ending Date
6/30/2019
Contract Document Type
Agreement - Construction
Agenda Item
5/2/19; 8-e
Amount
$88,673.00
Document Relationships
Agenda 05-02-2019 - 8-e - Approval of Budget Amendment #8-A for Repair of the Soltys Adult Day Health Space at the Passmore Center
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 05-02-19 Regular Meeting
R 2019-261 AMS - Sasser Companies Soltys remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:7921C9F2-E2B2-4C4B-B625-4F34C81CBE76 <br /> SrSasser Companies -Remediation Division <br /> OC-SOLTY <br /> Main Level <br /> Main Level <br /> DESCRIPTION QTY UNIT PRICE TOTAL <br /> 1. Metal studding,3 5/8"wide, 16"OC,20 gauge 826.67 SF @ 3.50= 2,893.35 <br /> 3. Sprayed polyurethane foam-21b mix-per inch thick 3,306.67 SF @ 1.80= 5,952.01 <br /> 48. Containment Barrier/Airlock/Decon. Chamber 168.00 SF @ 0.83= 139.44 <br /> 37. Neg.air fan/Air scrub.-XLrg(per 24 hr period)-No monit. 15.00 DA @ 140.00= 2,100.00 <br /> 3 air scrubbers for 5 days during work. <br /> 38. Add for HEPA filter(for neg.air machine/vacuum-Large) 3.00 EA @ 242.62= 727.86 <br /> 47. Duct Cleaning 1.00 EA @ 5,000.00= 5,000.00 <br /> 50. Electrical(Bid Item) 1.00 EA @ 5,000.00= 5,000.00 <br /> To relocate electrical into the new stud wall. <br /> 51. Commercial Supervision/Project Management-per hour 60.00 HR @ 65.00= 3,900.00 <br /> Fitness Height: 16' <br /> DESCRIPTION QTY UNIT PRICE TOTAL <br /> 5. R&R 5/8"drywall-hung,taped,floated,ready for paint 816.00 SF @ 3.18= 2,594.88 <br /> 8. Seal/prime then paint the surface area twice(3 coats) 816.00 SF @ 2.75= 2,244.00 <br /> 43. Paint the walls-one coat 1,920.00 SF @ 0.89= 1,708.80 <br /> 21. R&R Suspended ceiling grid-2'x 4' 160.63 SF @ 1.86= 298.77 <br /> 22. R&R Acoustic ceiling tile 642.50 SF @ 4.48= 2,878.41 <br /> 25. R&R Cove base molding-rubber or vinyl,6"high 120.00 LF @ 2.48= 297.60 <br /> 34. HEPA Vacuuming-Detailed-(PER SF) 6,410.00 SF @ 0.73= 4,679.30 <br /> 35. Clean more than the walls-Heavy 3,205.00 SF @ 0.61 = 1,955.05 <br /> 42. Remove Special Doors-Folding partition 170.00 SF @ 0.80= 136.00 <br /> 39. Install Special Doors-Folding partition 170.00 SF @ 5.49= 933.30 <br /> Contents <br /> DESCRIPTION QTY UNIT PRICE TOTAL <br /> 49. Content Manipulation(Bid Item) 1.00 EA @ 36,000.00= 36,000.00 <br /> OC-SOLTY 4/11/2019 Page:2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.