Orange County NC Website
Scope of Services <br />DEQ Site-wide Environmental Monitoring Plan <br />April 23, 2019 <br />Page 2 of 3 <br />P:\R00\500\R00592\R00592-179N2\PROPOSAL-CONTRACT\PRO 19 0423 Combined Monitoring Plan - CGD.docx <br />Fee Estimate <br />Fees are set forth on a lump sum basis, and will be billed based upon estimated percent complete. The <br />estimated fee for this project as identified in the Scope of Services is proposed as follows: <br />Develop Environmental Monitoring Plan and Develop Cost Estimate for CPCC <br /> <br />Environmental Monitoring Plan $18,200 <br />Closure Post Closure Care Cost Estimate $3,650 <br /> TOTAL $21,850 <br /> <br />Work will be conducted in accordance with this proposal and the existing contract between Orange <br />County, hereinafter referenced as “County”, and Draper Aden Associates, hereinafter referenced as <br />“Engineer”. <br /> <br />If you have any questions, please contact us via telephone at (919)827-0864 or electronic mail, <br />tclayton@daa.com or gdively@daa.com. <br />Sincerely, <br />Draper Aden Associates <br /> <br /> <br /> <br /> <br /> <br />C. Tyrus Clayton, Jr., PE <br />Team Leader/Senior Associate <br /> <br /> <br /> Gordon Dively, PE <br />Senior Engineer <br /> <br /> <br /> <br /> <br />cc: file <br />DocuSign Envelope ID: 8BD338DF-BC9A-4123-BF0E-29954134A47B