Orange County NC Website
Task 3: Total $9,884.00 as set forth below <br />All necessary material, labor, supervision and tools to provide power to (3) gates at the Orange <br />County landfill entrances. <br />Includes: <br />ƒ LABOR <br />ƒ MATERIALS <br />ƒ PERMIT <br />a. Gate 1: Total: $1910.00 <br />x Trench and install conduit from existing automatic gate arm control panel over to <br />keypad. Approximately 40ft. <br />x Disconnect and remove the second automatic gate arm control panel and set junction <br />box to extend power over to new motor. <br />x Use existing conduits and 120v circuit to operate new motor. <br />x Service disconnect at motor. <br />b. Gate 2: Total: $3531.00 <br />x Bore (2) conduits for low and high voltage cables from gate motor to the second motor. <br />x Trench, install conduit from gate motor to keypad, approximately 30ft. <br />x Trench, install conduit and wiring from existing automatic gate arm control panel to new <br />gate motor. Use existing circuit provided. <br />x Service disconnect at each motor. <br />c. Gate 3: Total: $4443.00 <br />x Bore (1) conduit from keypad to new gate motor, approximately 40ft. <br />x Bore (1) conduit and install wiring from new gate motor over to panel inside office for <br />power, approximately 150ft. <br />x Install breaker at panel inside office. <br />x Service disconnect at motor. <br />Excludes: <br />x LOW VOLTAGE WIRING <br /> <br />DocuSign Envelope ID: A5151355-999B-413E-A0E3-C722EE592B4B