Browse
Search
2019-250-E Solid Waste - Bryant Durham electrical services
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-250-E Solid Waste - Bryant Durham electrical services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2019 12:27:33 PM
Creation date
5/1/2019 11:30:53 AM
Metadata
Fields
Template:
Contract
Date
4/18/2019
Contract Starting Date
4/18/2019
Contract Ending Date
5/30/2019
Contract Document Type
Agreement - Services
Amount
$17,408.00
Document Relationships
R 2019-250 Solid Waste - Bryant Durham electrical services
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 3: Total $9,884.00 as set forth below <br />All necessary material, labor, supervision and tools to provide power to (3) gates at the Orange <br />County landfill entrances. <br />Includes: <br /> LABOR <br /> MATERIALS <br /> PERMIT <br />a. Gate 1: Total: $1910.00 <br />x Trench and install conduit from existing automatic gate arm control panel over to <br />keypad. Approximately 40ft. <br />x Disconnect and remove the second automatic gate arm control panel and set junction <br />box to extend power over to new motor. <br />x Use existing conduits and 120v circuit to operate new motor. <br />x Service disconnect at motor. <br />b. Gate 2: Total: $3531.00 <br />x Bore (2) conduits for low and high voltage cables from gate motor to the second motor. <br />x Trench, install conduit from gate motor to keypad, approximately 30ft. <br />x Trench, install conduit and wiring from existing automatic gate arm control panel to new <br />gate motor. Use existing circuit provided. <br />x Service disconnect at each motor. <br />c. Gate 3: Total: $4443.00 <br />x Bore (1) conduit from keypad to new gate motor, approximately 40ft. <br />x Bore (1) conduit and install wiring from new gate motor over to panel inside office for <br />power, approximately 150ft. <br />x Install breaker at panel inside office. <br />x Service disconnect at motor. <br />Excludes: <br />x LOW VOLTAGE WIRING <br /> <br />DocuSign Envelope ID: A5151355-999B-413E-A0E3-C722EE592B4B
The URL can be used to link to this page
Your browser does not support the video tag.