Browse
Search
ORD-2019-015 UDO amendment Permitted Uses Table
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2010-2019
>
2019
>
ORD-2019-015 UDO amendment Permitted Uses Table
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2019 10:12:29 AM
Creation date
4/26/2019 1:54:11 PM
Metadata
Fields
Template:
BOCC
Date
4/16/2019
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
5-a
Document Relationships
Agenda 04-16-2019 5-a - Unified Development Ordinance (UDO) Table of Permitted Uses
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 04-16-19 Regular Meeting
Minutes 04-16-2019 Regular Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2019
Statement of Consistency - Permitted Use Table (approved 041619)
(Message)
Path:
\Board of County Commissioners\Various Documents\2010 - 2019\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 5: Uses <br /> Section 5 .2 : Table of Permitted Uses <br /> CONDITIONALE • <br /> GENERAL USE ZONING DISTRICTS24 EcoNomic DEVELOPMENT DiSTHICTS CONDITIONAL ZONING <br /> USE TYPE <br /> — F) <br /> u <br /> 68 Elevated Water Storage Tanks B B B B B B B B B B B B B B B B 8 B B B B ns 8 ' <br /> Public Utility Stations & Sub- <br /> 7-2- Stations, Switching Stations, A A A A A A A A A A A A A A A A A A A A A A A A A A ` <br /> 69 Telephone Exchanges, Water & <br /> Sewage Treatment Plants <br /> 73- Electric, Gas, and Liquid Fuel B B 8 8 8 B B 8 B B 8 B B B B B B B B 8 B B B ' <br /> 70 Transmission Lines <br /> 7. -. Water & Sanitary Sewer <br /> 71 Pumping <br /> '� SolarAray — Large Facility B B B B B B B B B B 8 B B B B B B B B B 8 B B ` <br /> 72 <br /> ' SolarAray — Public Utility A A A A A A A A A A A A A A A A A A A A A A A ` <br /> 73 <br /> WASTE MANAGEMENT USES <br /> 74 Landfills (2Asres oFMsre y A A A LA A A A <br /> " 6a S B S S B <br /> 73. Waste Management Facility, A A A <br /> 75 Haaatdeug ° ToxiG— <br /> Wholesale Trade Uses '" <br /> 7A. Wholesale Trade el_8ara9fe 119 <br /> Assembly Uses <br /> 114 Staff is keeping regulations governing the development of 'utilities' the same for the time being. We are working with the Counq/s Attorney Office to ascertain ff we are, in fact, pre-empted to require local permits for activities regulated by the State Utility <br /> Commission. <br /> 11s Staff is recommending changing the review process within the EDH-4 and EDH-5 general use zoning districts to be consistent with the review of similar projects in other Economic Development general use zoning districts. <br /> 116 Staff is recommending these land uses be combined with new language added in Article 5 and require approval of all landfill operations through the Class A Special Use Permit process. <br /> 11'! Staff has collapsed this use category, which originally had approximately 12 to 14 individual land uses Into a single land use category, <br /> 11a Originally, staff had recommended gland uses, specifically Wholesale Trade of Durable Goods and 'Wholesale Trade of Non-Durable Goods'. After meeting with the County Attorney, these will now be combined into a single land use category. This was approved <br /> by the Planning Board at its March 6, 2019 regular meeting. <br /> 139 Staff is recommending the uses be permitted within the EDH-4 and EDH-5 zoning districts. <br /> 120 This has been combined into a single land use category called 'Wholesale Trade of Goods'. Staff is no longer recommending a distinction between durable and non-durable goods. <br /> Orange County, North Carolina — Unified Development Ordinance Page 5-33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.