Orange County NC Website
7 <br /> 1 <br /> 2 Commissioner Dorosin referred to page 33 in the book, which says, "future years will <br /> 3 take into account the relocation of the detention center and subsequent disposition and/or <br /> 4 master planning for the entire downtown site," and asked if the County or Hillsborough will be <br /> 5 doing this master planning. <br /> 6 Travis Myren said this would be a cooperative effort between the Town and the County. <br /> 7 He resumed the PowerPoint presentation: <br /> 8 <br /> 9 o FY2018-19 Funding Repurposed for Remediation Projects <br /> 10 o Reconfigure and Remodel Courthouse Lower Level Space <br /> 11 Improve use by CJRD, Sheriff's Office, District Attorney's Office <br /> 12 <br /> 13 Facility Safety & Accessibility- $371,000 (p. 35) <br /> 14 o Countywide Accessibility Projects - $27,500 <br /> 15 o Safety Manual for Construction Projects - $8,000 <br /> 16 o 510 Meadowlands Security Cameras - $7,500 <br /> 17 o 510 Roof Deflection Warning System - $12,500 <br /> 18 o River Park Accessible Sidewalk from Bus Stop - $88,000 <br /> 19 o Field House Roof Deflection Warning System - $12,500 <br /> 20 o Whitted Steps and Curb Repair- $185,000 <br /> 21 o Multiple Facility Automatic External Defibrillators - $30,000 <br /> 22 <br /> 23 Generator Projects - $158,000 (p. 37) <br /> 24 o Design and Engineering - $10,000 <br /> 25 o Hillsborough Commons - $23,000 <br /> 26 Complete Connection of all Electrical Services at the Social Services <br /> 27 Building <br /> 28 o Piedmont Food Processing Center— $125,000 <br /> 29 ■ New Generator to Maintain Continuous Refrigeration <br /> 30 ■ Funded with Article 46 Sales Tax <br /> 31 ■ Research on Solar Powered Battery Collection and Storage <br /> 32 ❖ 350 kW Generator <br /> 33 ❖ Need 70 Tesla Powerwall Units + 350 kW Solar Farm - <br /> 34 $1,025,000- (more viable going forward) <br /> 35 ❖ Three Hour (3) Hour Capacity <br /> 36 <br /> 37 Commissioner McKee asked if there is a generator currently. <br /> 38 Travis Myren said no. <br /> 39 Commissioner McKee said this building needs a generator. <br /> 40 <br /> 41 Travis Myren resumed the PowerPoint presentation: <br /> 42 <br /> 43 Government Services Annex- $375,000 (p. 38) <br /> 44 o Sealing Basement and Moving Access <br /> 45 o Water Intrusion Prevention <br /> 46 o Storm water and Drainage Around Building <br /> 47 <br /> 48 Commissioner Dorosin asked if the basement is going to be sealed off permanently. <br /> 49 Travis Myren said yes. <br /> 50 Commissioner Dorosin asked if that is considered a permanent solution, or at some <br /> 51 point will the building need to be vacated. <br />