Browse
Search
Agenda 05-02-2019 - 6-b - Interlocal Agrmt with Chapel Hill and Carrboro Related to Historic Rogers Rd Area Private Sewer Service Lateral Connection Installations for Qualified LMI Homeowners – Cost Share
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2019
>
Agenda - 05-02-19 Regular Meeting
>
Agenda 05-02-2019 - 6-b - Interlocal Agrmt with Chapel Hill and Carrboro Related to Historic Rogers Rd Area Private Sewer Service Lateral Connection Installations for Qualified LMI Homeowners – Cost Share
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2019 5:09:30 PM
Creation date
4/25/2019 4:59:02 PM
Metadata
Fields
Template:
BOCC
Date
5/2/2019
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6-b
Document Relationships
2019-475 Planning - Interlocal agreement for Historic Rogers Road Sewer Connection cost sharing
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
Agenda 05-02-2019 Regular Board Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 05-02-19 Regular Meeting
Minutes 05-02-2019 Regular Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 11 <br /> Page 2 of 5 <br /> scope of the Project, as will be described in Exhibit A, as the same may be revised fiom time to <br /> time by the parties. <br /> 2. Preliminary Engineering Activities. <br /> a. OWASA shall undertake to prepare or have prepared preliminary <br /> engineering work to assist the County in determining the scope, location, design, and course of <br /> work that will be necessary to complete the Project. To the extent known and available at the <br /> time this Agreement is executed, the nature and extent of the Project shall be as described in <br /> Exhibit A, to be attached. If not available at the time this Agreement is executed,Exhibit A may <br /> be hereafter provided, or amended from time to time, by the parties, at the County's direction. <br /> b. OWASA shall employ engineers and consultants as necessary to assist in <br /> this work. OWASA's staff may also assist in this work. OWASA shall be solely responsible for <br /> costs incurred by its own staff work. Orange County shall reimburse OWASA for the costs of <br /> work by outside engineers and consultants engaged by OWASA, with the County's concurrence, <br /> for this work. <br /> C. Design plans for the Project shall be consistent with OWASA's usual <br /> standards and specifications, and shall be executed in accordance with OWASA's usual <br /> procedures, as well as with the County's directions as to scope of the Project facilities. OWASA <br /> shall develop the draft scope for this preliminary engineering work; provided,both the County <br /> and OWASA shall approve the final scope of work for the preliminary engineering work for the <br /> Project. <br /> d. The costs of the preliminary engineering for the Project shall initially be <br /> paid for by OWASA. Upon receipt of OWASA's invoices to recover the costs for this work,the <br /> County shall reimburse OWASA for all costs associated with the preliminary engineering work <br />
The URL can be used to link to this page
Your browser does not support the video tag.