Browse
Search
Agenda 05-02-2019 - 6-b - Interlocal Agrmt with Chapel Hill and Carrboro Related to Historic Rogers Rd Area Private Sewer Service Lateral Connection Installations for Qualified LMI Homeowners – Cost Share
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2019
>
Agenda - 05-02-19
>
Agenda 05-02-2019 - 6-b - Interlocal Agrmt with Chapel Hill and Carrboro Related to Historic Rogers Rd Area Private Sewer Service Lateral Connection Installations for Qualified LMI Homeowners – Cost Share
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2019 4:48:35 PM
Creation date
4/25/2019 4:31:04 PM
Metadata
Fields
Template:
BOCC
Date
5/2/2019
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Agenda 05-02-2019 Regular Board Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2019\Agenda - 05-02-19
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:09FB8A3C-9304-40E2-8033-A5FF7CBA6067 25 <br /> These concentrations can be separated based on timeline and role. Both numbers <br /> below assume a 6-month contract period of work. The exact amount will depend <br /> on final scope and amount of time required. <br /> Areal: Sewer Implementation Outreach $42,100 <br /> Area 2: Communihj First Planning $47,800 <br /> *The total compensation includes all staff costs, sub-contracts (RENA, mapping, <br /> database, technical and design, etc) and program support that will enable this <br /> initiative to be successful. <br /> Payment: 25% of overall contract invoiced upon signing ($22,475). Billing for the <br /> remainder will be every two months from beginning of the contract, with 25% of <br /> each concentration billed at the two and four month marks, and the final 25% at <br /> the conclusion of the 6-month contract. <br />
The URL can be used to link to this page
Your browser does not support the video tag.