Browse
Search
Agenda 05-02-2019 - 6-b - Interlocal Agrmt with Chapel Hill and Carrboro Related to Historic Rogers Rd Area Private Sewer Service Lateral Connection Installations for Qualified LMI Homeowners – Cost Share
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2019
>
Agenda - 05-02-19
>
Agenda 05-02-2019 - 6-b - Interlocal Agrmt with Chapel Hill and Carrboro Related to Historic Rogers Rd Area Private Sewer Service Lateral Connection Installations for Qualified LMI Homeowners – Cost Share
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2019 4:48:35 PM
Creation date
4/25/2019 4:31:04 PM
Metadata
Fields
Template:
BOCC
Date
5/2/2019
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Agenda 05-02-2019 Regular Board Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2019\Agenda - 05-02-19
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 12 <br /> Page 3 of 5 <br /> for the Project. OWASA shall be solely responsible for the costs of its own staff s work in <br /> coordinating the preliminary engineering work for the Project. <br /> e. In order to ensure proper and effective project management, the <br /> engineering consultant and any sub-consultants shall report to OWASA staff who shall work <br /> closely with County staff to ensure the County's requirements for the Project are met. In the <br /> event of any apparent�conflicts between the CoLuity's and OWASA's requirements, the parties <br /> shall work together to find reasonable compromise and acconunodations for the Project, <br /> consistent with OWASA's service standards. <br /> f. In close coordination with OWASA and consistent with the need for <br /> effective project management,the County Staff will have full access to the engineering <br /> consultant(s) and all relevant sub-contractors,who, at the County's request, shall meet with the <br /> County representatives or otherwise provide any information needed by the County on any <br /> aspect of the Project. OWASA will authorize the engineering and consultant(s) and <br /> subcontractors to meet with County representatives and to provide any information needed by <br /> the County on any aspect of the Project. <br /> g. The County shall be responsible for contracting with and coordinating <br /> community outreach partnering with organizations such as the Jackson Center and Rogers <br /> Eubanks Neighborhood Association to identify action steps to provide infon-nation and <br /> assistance concerning the Project to the Rogers Road neighborhood. <br /> h. Costs for the Project shall not exceed one hundred thirty thousand dollars <br /> ($130,000.00). Should the parties anticipate costs will exceed this amount the parties shall <br /> consider an amendment to this Interlocal Agreement to address the cost increase. <br />
The URL can be used to link to this page
Your browser does not support the video tag.