Orange County NC Website
Sportsplex - Pool <br /> Project Category: Sportsplex Capital Project Status: Active Project Type <br /> Functional Service Community Services Proposed Bid N/A New X <br /> Area: Award Date: <br /> Department: Sportsplex Starting Date: 7/1/19 Expansion <br /> Project Number: Fund 53 Completion Date: 6/30/23 Renovation <br /> Replacement X <br /> Project Description/Justification: Funding in FY 2018-19 of 116 <br /> $80,000 is being used to replace the compressors on one of the <br /> two major pool HVAC systems that is experiencing recurring, i <br /> premature failures. Funding in FY 2018-19 also included <br /> $12,000 for handicap pool lifts to complement the handicap t <br /> ramp currently in place. These projects will be completed by <br /> June 2019. <br /> Funding in FY 2019-20 includes $52,000 to replace the <br /> competition pool boiler with a new high efficency model. The <br /> new unit will have at least twice the useful life as the existing J z <br /> unit. FY 2021-22 includes $40,000 for replacement of the pool <br /> lane timer/scoreboard. FY 2023-24 anticipates the $320,000 <br /> replacement of one of the two large capacity aquatics HVAC <br /> systems. The nature/type of these systems will be determined after a comprehensive Natatorium study. <br /> FINANCIAL SUMMARY <br /> Current Year 1 Year 2 Year 3 Year 4 Year 5 Five Year 6 <br /> Prior Years Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Year to <br /> Project Budget Funding 2018-19 2019-20 2020-21 2021.22 2022-23 2023-24 Total Year10 <br /> Appropriation <br /> Land/Building - <br /> Professional Services - <br /> Construction/Repairs/Renovations <br /> Pool Wall Reglaze 125,000 - <br /> Pools Replaster/Tile/Blocks 150,000 150,000 <br /> Pool Water Reclamation Project 40,000 - <br /> EquipmenUFurnishings <br /> Pool Lane Timer/Scoreboard 15,000 40,000 40,000 <br /> Pool Pumper/Filter 57,000 - <br /> Boiler/Pumps 75,000 52,000 25,000 77,000 100,000 <br /> Natatorium Equipment Replacement Project 80,000 320,000 320,000 375,000 <br /> Natatorium Engineering Study 20,000 - <br /> Handicap Lift(s) 12,000 <br /> Total Project Budget: 462,000 112,000 1 52,000 - 40,000 25,000 320,000 437,000 1 625,000 <br /> Revenues/Funding Source <br /> Debt Financing - <br /> Sportsplex Funds 462,000 112,000 52,000 40,000 25,000 320,000 437,000 625,000 <br /> Total 462,000 112,000 52,000 - 40,000 25,000 320,000 437,000 625,000 <br /> Sportsplex Related Operating Costs <br /> Personnel Services - <br /> Operations (40,000) (40,000) (40,000) (40,000) (40,000) (200,000) (200,000) <br /> Recurring Capital <br /> New/Addl Revenue - <br /> Total Operating Costs (40,000) (40,000) (40,000) (40,000) (40,000) (200,000) (200,000) <br /> 112 <br />