Browse
Search
2019-231-E Planning - Transstate LLC Efland Sewer Repairs
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-231-E Planning - Transstate LLC Efland Sewer Repairs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2019 9:04:32 AM
Creation date
4/18/2019 2:19:36 PM
Metadata
Fields
Template:
Contract
Date
4/15/2019
Contract Starting Date
4/15/2019
Contract Ending Date
5/31/2019
Contract Document Type
Agreement - Construction
Amount
$48,375.00
Document Relationships
R 2019-231 Planning - Transstate LLC Efland Sewer Repairs
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:8BEB6A42-094D-454B-878B-4C7142FFC9A3 <br /> Ice <br /> (i)PiePatc <br /> 1 a sf <br /> L�7 U.R CwJv <br /> I,A,S:nAv <br /> NO DIG p Repair System PMG <br /> AVERAGE I 1 r l <br /> AVERAGE + 27,500 psi <br /> AVERAGE FLEXURAL MODULUS: 7,345,000 pSi Beiort Repair <br /> Odom.. <br /> TECHNICAL DATA <br /> • Odorless and ideal for working in confined spaces � � ' <br /> • Outstanding bonding properties to most materials <br /> • Resistance to 63+chemicals and oils <br /> • Non-flammable,making it ideal for hotels,airports,hospitals,etc. i <br /> • Non-hazardous,so no transport or disposal problems <br /> • Resin cures in the presence of water <br /> • Structural properties exceed the minimum requirements of ASTM F 1216 , <br /> ENVIRONMENTALLY SAFE ' <br /> • PipePatch contains no VOCs or Styrene <br /> • Safe for storm and sanitary sewers <br /> • PipePatch resin does not get hot <br /> • Maximum temperature may reach 105"F <br /> • Safe to touch and safe on packers <br /> APPLICATION ADVANTAGES • • • • ' * . • .�. <br /> • Available to repair 11/2"-72"diameter pipe in24" and48"lengths • • • • <br /> * Flow-thru packers prevent backups during repairs <br /> • No more costly,disruptive and time consuming excavations <br /> • No more road closures or traffic back ups during repairs <br /> • Only standard sewer cleaning and inspection equipment required <br /> • Small repair crews-as few as 1 to 3 people <br /> * Short repair times-several can be done in one day <br /> • Field tested for over 10 years with a durable 50 year repair life <br /> 1, • - . . <br /> o �. <br /> m <br /> 1, �P Phone:810-�412-4740 * www.SlEonline.com <br /> Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.