Orange County NC Website
STAFF COMMENT – OPEN SPACE:Staff has no concerns related to the location or <br />composition of the proposed open space. <br />Landscape Buffers/Setbacks: The Concept Plan denotes a 75 foot wide Type E natural/constructed <br />landscape buffer along US Highway 70 East. This area will be planted with additional materials and <br />landscaped (e.g. berms/fencing) to augment preserved existing vegetation. The 75 foot buffer will be <br />meet the required Type E Buffer, as outlined in Section 6.8.6(F) of the UDO. The applicant has <br />proposed a 50 foot perimeter well and septic setback and a 100 foot building setback, which would <br />limit structures, clearing and utilities along the perimeter and US Highway 70 East. <br />STAFF COMMENT – LAND USE BUFFER:Section 6.8.6 (D) of the UDO requires that this <br />project maintain a 75 foot wide Type E land use buffer separating the project from adjacent <br />roadways (i.e. US Highway 70 – Arterial). Staff has determined the proposed land use buffer <br />meets the requirements of the UDO. <br />Staff Generated Correspondence: Attachment 4 contains staff comments for this project as of <br />the date of abstract preparation. <br />Public Notification(s): Section 2.15.2 (D) of the UDO requires that each property owner within <br />1,000 feet be notified by regular mail of the Neighborhood Information Meeting (NIM). Staff <br />mailed out letters on January 29, 2019 to the property owners within 1,000 feet of the property <br />concerning the February 13, 2019 NIM. Please refer to Attachment 3 for additional information <br />on the NIM. <br />Planning Board notifications were also mailed out to the owners within 1,000 feet of the property <br />on March 22, 2019. These notices informed residents of the change in development proposal <br />(i.e. reduction in the number of proposed lots from 27 to 20) and that the Concept Plan would be <br />reviewed by the Planning Board on April 3, 2019. <br />A sign was posted on the property on March 22, 2019 indicating the Planning Board’s review of <br />the Concept Plan. <br />Analysis: As required under Section 2.15.2 (E) of the UDO, the Planning Director is required to: <br />‘prepare and submit a recommendation’on the concept plan to the Planning Board for <br />consideration. In analyzing this request, the Planning Director offers the following: <br />1. The application has been deemed complete in accordance with the requirements of <br />Section 2.2 and 2.15.2 of the UDO. <br />2. Staff has determined that the property is of sufficient size to support the proposed <br />subdivision. <br />3. The proposal appears consistent with the various goals outlined within the <br />Comprehensive Plan concerning development, including: <br />a. Land Use Overarching Goal: Coordination of the amount, location, pattern, and <br />designation of future land uses, with availability of County services and facilities <br />sufficient to meet the needs of Orange County’s population and economy <br />consistent with other Comprehensive Plan element goals and objectives. <br />b. Land Use Goal 2: Land uses that are appropriate to on-site environmental <br />conditions and features and that protect natural resources, cultural resources, and <br />community character. <br />29