Browse
Search
Planning Board agenda 032019
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2019
>
Planning Board agenda 032019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 12:10:04 PM
Creation date
4/15/2019 5:00:32 PM
Metadata
Fields
Template:
BOCC
Date
3/20/2019
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 5: Uses <br /> Section 5.12: Standards for Extractive Uses <br /> <br /> <br /> <br />Orange County, North Carolina – Unified Development Ordinance Page 5-138 <br /> <br />(c) Letters from the appropriate agencies that the facility has adequate <br />protection against fire, vandalism and personal injury. <br />(d) Survey of floodplain and floodway location on the site plan. <br />(e) An emergency management plan that has been submitted to the <br />appropriate North Carolina State agency, and approved. <br />(2) Standards of Evaluation <br />(a) All necessary State permits have been applied for and granted to the <br />applicant. <br />(b) The description of the type facility planned, including a detailed <br />description of the type wastes to be stored or disposed of on the site, the <br />size of the finished project, method of storage or final disposal. <br />(c) Adequate fire, police and rescue protection can be provided. The <br />appropriate agencies have written letters confirming adequate protection. <br />(d) The site is of adequate size to provide a buffer for adjacent properties. <br />The buffer shall also be of sufficient size to prevent adverse effects in <br />adjacent property. <br />(e) Access to the site is directly from an interstate, arterial, or major collector <br />street. <br />(f) Accident prevention/emergency management plan approved by the <br />State. <br />(g) Location of flood plain if any is on site. <br />(h) The site plan has buffer from streams. <br />SECTION 5.12: STANDARDS FOR EXTRACTIVE USES <br />5.12.1 Borrow Pits for Federal and State Highway Projects <br />(A) Use Standards <br />(1) Permitted by right in all districts in accordance with the provisions of Section <br />5.1.1 of this Ordinance <br />(A)(B) General Standards of Evaluation <br />(1) The borrow pit is located within one-half mile of the construction site; <br />(2) An Erosion Control Plan has been approved by the Department of Environment, <br />Health and Natural Resources; <br />(3) The material extracted is to be used solely for a State or Federal road <br />construction project; and <br />(4) Road construction plans include provision for reclaiming the excavated area. If <br />the reclamation plan involves filling the excavated area, the fill material must be <br />inert material defined as beneficial fill by the Solid Waste Branch of the <br />Department of Environment and Natural Resources, provided that the debris is <br />also associated with a State or Federal Highway road construction project. <br />Inclusion of reusable or recyclable materials in the reclamation or filling of the <br />borrow pit should be minimized. A proposed debris recycling program or a <br />statement as to why material will not be recycled must be submitted for review by <br />Orange County. <br />5.12.2 Extraction of Earth Products <br />(A) Use Standards <br />(1) Shall not be permitted as a Conditional Use District. Refer to Section 5.1.3 of <br />117
The URL can be used to link to this page
Your browser does not support the video tag.