Orange County NC Website
Article 5: Uses 67 <br /> Section 5.4: Standards for Temporary Uses <br /> (c) Written comments from the Orange County Health Department, Division <br /> of Environmental Health regarding the adequacy of plans restroom <br /> facilities and food preparation/handling arrangements; and <br /> (d) Written comments from the Orange County Fire Marshal and Sheriff's <br /> Department regarding the adequacy of parking, access, or other factors <br /> related to public safety. <br /> (2) Standards of Evaluation <br /> (a) The lot shall contain a minimum of five acres and shall be adequate to <br /> accommodate all proposed activities, including safe vehicular and <br /> pedestrian circulation, and the maximum number of participants for any <br /> single event. <br /> (b) The maximum number of participants at any given time at any event <br /> shall be 150 persons. <br /> (c) The proposed activity will occur no more frequently than seven days in a <br /> 30-day period, and on no more than 50 days per year. <br /> (d) Signs shall be permitted in accordance with Section 6.12.11(D) of this <br /> Ordinance. <br /> (e) All parking shall be on-site. <br /> (f) Noise levels at the boundary of the area included in the special Use <br /> Permit shall not exceed 50 decibels between the hours of 7:00 a.m. and <br /> 7:00 p.m., or 45 decibels between the hours of 7:00 p.m. and midnight. <br /> No Special Event shall begin before 7:00 a.m., or extend beyond <br /> midnight. <br /> (g) The site plan shall have the written approval of the Orange County <br /> Division of Environmental Health regarding the adequacy of the water <br /> supply and wastewater disposal for the specified maximum number of <br /> participants for any single event and the written approval of the Orange <br /> County Fire Marshal and Orange County Sheriff's Department regarding <br /> the adequacy of parking, access or other factors relating to public safety. <br /> (h) The Special Use Permit shall be valid for no more than one year. <br /> 5.4.4 Temporary Use of a Residential Mobile Home <br /> (A) moral Standards of Evaluation <br /> Residential Mobile Homes may be permitted as a temporary use during construction in <br /> accordance with the following: <br /> (1) The property owner shall reside in the temporary residential mobile home during <br /> construction of a new residence or the renovation of an existing residence on the <br /> same lot. <br /> (2) Prior to placement of the temporary residential mobile home on-site all applicable <br /> state and local approvals and permits shall be procured, including but not limited <br /> to a zoning compliance permit, building permits, and health department approval. <br /> (3) The temporary residential mobile home must be removed within 90 days of <br /> receipt of the certificate of occupancy for the on-site residence. <br /> Orange County, North Carolina—Unified Development Ordinance Page 5-42 <br />