Browse
Search
Planning Board agenda 030619
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2019
>
Planning Board agenda 030619
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 12:05:57 PM
Creation date
4/15/2019 4:58:17 PM
Metadata
Fields
Template:
BOCC
Date
3/6/2019
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 5: Uses 127 <br /> Section 5.13: Standards for Agricultural Uses <br /> existing zoning district allows a residential density of 1 unit for 2 acres and the <br /> proposed use is on a six acre parcel (which could yield 3 residences), the <br /> proposed use(s) may use three times the water used by an average single family <br /> residence (or 720 gallons per day, on an annualized basis) before a <br /> comprehensive groundwater study is required. The water usage rates of any <br /> existing use subject to zoning regulations located on the same lot shall be taken <br /> into account when determining if a comprehensive groundwater study is required. <br /> Said study shall detail: <br /> (a) The amount of water anticipated to be used on a daily, weekly, monthly, <br /> and annual basis by regulated uses located on the parcel (e.g., water <br /> usage by bona fide farm uses is not required to be included); <br /> (b) An analysis of the amount of groundwater withdrawal considered to be <br /> safe and sustainable in the immediate vicinity; and <br /> (c) An analysis of whether other wells in the vicinity of the proposed use are <br /> expected to be affected by withdrawals made by the proposed use. <br /> 5.13.8 Farm Equipment Rental, Sales and Service <br /> (A) Use Standards <br /> (1) Shall not be permitted as a Conditional Use District. Refer to Section 5.1.3 of <br /> this Ordinance. <br /> fA}LLGe-n-eralrStandards for of Evaluation <br /> (1) Outdoor display and storage of equipment shall be permitted in the side and rear <br /> yards of the primary structure and shall be screened from view of adjacent <br /> properties. <br /> (2) Service bays shall be located at the side or rear of a structure and shall not be <br /> visible from adjacent residential property or the road right-of-way. <br /> (3) The site shall be located on a major road, as classified in the Orange County <br /> Comprehensive Plan, unless permitted as an ASE-CZ. <br /> (4) Parking shall not be located in the front yard space. <br /> (5) Application materials shall include a comprehensive groundwater study, for <br /> facilities expected to use more groundwater on an annual basis than an average <br /> single family residence (which uses 240 gallons of water per day) built at the <br /> highest density the existing zoning district would allow. For example, if the <br /> existing zoning district allows a residential density of 1 unit for 2 acres and the <br /> proposed use is on a six acre parcel (which could yield 3 residences), the <br /> proposed use(s) may use three times the water used by an average single family <br /> residence (or 720 gallons per day, on an annualized basis) before a <br /> comprehensive groundwater study is required. The water usage rates of any <br /> existing use subject to zoning regulations located on the same lot shall be taken <br /> into account when determining if a comprehensive groundwater study is required. <br /> Said study shall detail: <br /> (a) The amount of water anticipated to be used on a daily, weekly, monthly, <br /> and annual basis by regulated uses located on the parcel (e.g., water <br /> usage by bona fide farm uses is not required to be included); <br /> (b) An analysis of the amount of groundwater withdrawal considered to be <br /> safe and sustainable in the immediate vicinity; and <br /> (c) An analysis of whether other wells in the vicinity of the proposed use are <br /> expected to be affected by withdrawals made by the proposed use. <br /> Orange County, North Carolina—Unified Development Ordinance Page 5-145 <br />
The URL can be used to link to this page
Your browser does not support the video tag.