Browse
Search
Planning Board agenda 030619
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2019
>
Planning Board agenda 030619
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 12:05:57 PM
Creation date
4/15/2019 4:58:17 PM
Metadata
Fields
Template:
BOCC
Date
3/6/2019
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 5: Uses 123 <br /> Section 5.13: Standards for Agricultural Uses <br /> (n) Annual inspections of the operation shall be conducted by the Planning <br /> Director following submittal of the annual operations reports to determine <br /> compliance with the provisions of the Special Use Permit. <br /> (o) In cases of abandonment or termination of operations for a period of 12 <br /> consecutive months, application for a new Special Use Permit is <br /> required. <br /> (p) The Board of County Commissioners shall require for all extractive uses <br /> a performance guarantee to insure that the provisions of the <br /> Rehabilitation Plan are met. Such performance guarantee shall be in a <br /> form approved by the County Attorney. The amount of such guarantee <br /> shall cover the cost of rehabilitation on a per acre basis, if the cost does <br /> not exceed the amount posted with the State. If the rehabilitation cost <br /> exceeds the amounts required by the State then the difference shall be <br /> made up in a bond to Orange County. <br /> SECTION • - AGRICULTURAL USES <br /> 5.13.1 Agricultural Processing Facility <br /> (A) Use Standards <br /> (1) Shall not be permitted: <br /> (a) As a Conditional Use District. Refer to Section 5.1.3 of this Ordinance. <br /> T77 <br /> (b) Within the Rural Buffer land use classification, as designated by the <br /> adopted Comprehensive Plan, as part of a Conditional Zoning District <br /> application. " <br /> WLBLG,e-n-erat-Standards fer-of Evaluation <br /> (1) Application materials shall include a comprehensive groundwater study, for <br /> facilities expected to use more groundwater on an annual basis than an average <br /> single family residence (which uses 240 gallons of water per day) built at the <br /> highest density the existing zoning district would allow. For example, if the <br /> existing zoning district allows a residential density of 1 unit for 2 acres and the <br /> proposed use is on a six acre parcel (which could yield 3 residences), the <br /> proposed use(s) may use three times the water used by an average single family <br /> residence (or 720 gallons per day, on an annualized basis) before a <br /> comprehensive groundwater study is required. The water usage rates of any <br /> existing use subject to zoning regulations located on the same lot shall be taken <br /> into account when determining if a comprehensive groundwater study is required. <br /> Said study shall detail: <br /> (a) The amount of water anticipated to be used on a daily, weekly, monthly, <br /> and annual basis by regulated uses located on the parcel (e.g., water <br /> usage by bona fide farm uses is not required to be included); <br /> (b) An analysis of the amount of groundwater withdrawal considered to be <br /> safe and sustainable in the immediate vicinity; and <br /> (c) An analysis of whether other wells in the vicinity of the proposed use are <br /> expected to be affected by withdrawals made by the proposed use. <br /> 173 As previously indicated the County's Attorney office has advised symbols should only be utilized to denote <br /> review/approval processes for land uses. Regulatory allowances/prohibitions, such as the aforementioned <br /> language, is being moved into the individual land use standards contained in Article 5. <br /> 174 This is existing language from Section 5.2.3 Table of Permitted Uses-Conditional Zoning Districts incorporated <br /> herein consistent with advice from the County's Attorney office to limit the use of symbols within the proposed <br /> revision. <br /> Orange County, North Carolina-Unified Development Ordinance Page 5-141 <br />
The URL can be used to link to this page
Your browser does not support the video tag.