Browse
Search
Planning Board agenda 030619
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2019
>
Planning Board agenda 030619
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 12:05:57 PM
Creation date
4/15/2019 4:58:17 PM
Metadata
Fields
Template:
BOCC
Date
3/6/2019
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 5: Uses 122 <br /> Section 5.12: Standards for Extractive Uses <br /> (d) The site is of adequate size to provide a buffer for adjacent properties. <br /> The buffer shall also be of sufficient size to prevent adverse effects in <br /> adjacent property. <br /> (e) Access to the site is directly from an interstate, arterial, or major collector <br /> street. <br /> (f) Accident prevention/emergency management plan approved by the <br /> State. <br /> (g) Location of flood plain if any is on site. <br /> (h) The site plan has buffer from streams. <br /> SECTIONSTANDARDS FOR EXTRACTIVE USES <br /> 5.12.1 Borrow Pits for Federal and State Highway Projects <br /> (A) Use Standards <br /> (1) Permitted by right in all districts in accordance with the provisions of Section <br /> 5.1.1 of this Ordinance <br /> {A)LQLGe_n_era_l-Standards of Evaluation <br /> (1) The borrow pit is located within one-half mile of the construction site; <br /> (2) An Erosion Control Plan has been approved by the Department of Environment, <br /> Health and Natural Resources; <br /> (3) The material extracted is to be used solely for a State or Federal road <br /> construction project; and <br /> (4) Road construction plans include provision for reclaiming the excavated area. If <br /> the reclamation plan involves filling the excavated area, the fill material must be <br /> inert material defined as beneficial fill by the Solid Waste Branch of the <br /> Department of Environment and Natural Resources, provided that the debris is <br /> also associated with a State or Federal Highway road construction project. <br /> Inclusion of reusable or recyclable materials in the reclamation or filling of the <br /> borrow pit should be minimized. A proposed debris recycling program or a <br /> statement as to why material will not be recycled must be submitted for review by <br /> Orange County. <br /> 5.12.2 Extraction of Earth Products <br /> (A) Use Standards <br /> (1) Shall not be permitted as a Conditional Use District. Refer to Section 5.1.3 of <br /> this Ordinance. <br /> (2) Processing of materials on-site, beyond incidental mechanical consolidation or <br /> sorting to facilitate transportation off-site for further processing, is prohibited. i72 <br /> (B) Submittal Requirements and Standards of Evaluation for Class A Special Use <br /> Permit <br /> (1) Submittal Requirements <br /> In addition to the information required by Section 2.7, the following shall be <br /> submitted as part of the application: <br /> (a) 26 copies of the site plan, prepared by an appropriately licensed <br /> professional, which shall contain the following: <br /> 172 This is an existing prohibition contained within the definition of Extraction of Earth Products within Article 10 of <br /> the UDO. Staff is including language herein to specifically denote the prohibition. <br /> Orange County, North Carolina—Unified Development Ordinance Page 5-137 <br />
The URL can be used to link to this page
Your browser does not support the video tag.