Browse
Search
Agenda - 02-19-2002 - 8c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 02-19-2002
>
Agenda - 02-19-2002 - 8c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2017 4:38:21 PM
Creation date
8/29/2008 10:27:39 AM
Metadata
Fields
Template:
BOCC
Date
2/19/2002
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8c
Document Relationships
Minutes - 20020219
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20 <br /> use less than five years, the appearance of the floor show no wear, which is an indicator that <br /> they will be as reliable as the floors done in the 1982 renovation. <br /> All identified areas in the upper section of the Jail have now been completed. All areas in the <br /> lower section are scheduled to be completed by February 12, 2002. <br /> Item 3 <br /> Public Works contracted with Finnell Fine Coatings of Gamer for completion of this work.. <br /> Finnell Fine Coatings has completed a number of painting projects for Orange County <br /> including previous work at the Jail, all of which has been completed in a professional and <br /> timely manner. <br /> All painting of the cells on the upper level has been completed with the exception of two small <br /> areas in cells 'F' and 'G' that require related exterior brick repair work (see Item 4). <br /> The areas in cells 'F' and 'G' that require repair and repainting are a result of moisture intrusion <br /> from the building exterior related to deteriorated brick mortar. Public Works is contracting with <br /> Charles Latta of Hillsborough for repair and tuckpointing work that is required to prevent this <br /> moisture intrusion. Mr. Latta is scheduled to begin completion of this work during the week of <br /> February 11, 2002. Following completion of the tuckpointing work, Finnell Fine Coatings will <br /> return to complete the required repair and repainting in cells 'F' and 'G'. <br /> Item 4 <br /> As this roof is still under warranty, Public Works contacted Firestone Building Products <br /> Company per warranty provisions. Firestone contacted Baker Roofing of Raleigh, the original <br /> installer, and repairs have-been completed. Painting and repair of damaged areas will be <br /> completed by February 15, 2002. <br /> 11PU8WKS SVMV0LZ%SHAREMftb1k WorksOuildings&GrourWaUAILUW Rpt Respon"02-08-02.doe 2 Printed: <br /> 02/08/02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.