Browse
Search
Agenda 04-16-2019 5-a - Attachment 7a, 7b, 7c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2019
>
Agenda - 04-16-19 Regular Meeting
>
Agenda 04-16-2019 5-a - Attachment 7a, 7b, 7c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2019 2:07:16 PM
Creation date
4/12/2019 1:49:17 PM
Metadata
Fields
Template:
BOCC
Date
4/16/2019
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda - 04-16-2019 Regular Meeting
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 04-16-19 Regular Meeting
Agenda 04-16-2019 5-a - Unified Development Ordinance (UDO) Table of Permitted Uses
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 04-16-19 Regular Meeting
Minutes 04-16-2019 Regular Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 5: Uses 159 <br /> Section 5.6: Standards for Commercial Service Uses <br /> /n)The minimum In+ size for a Country Inn sing o private well and sceptic <br /> system shall he no less than ten acres 4 ,(',fin Country Inn may be permitted <br /> system �-ry-rc� � rr ccrra�.r�i. h'"����. <br /> on lets of less than ten anreP if the tract is n ntly served by public <br /> water and sewer subjeGt W the review and approval of the appropri <br /> anenni es and the Staff Engineer• or if the+ran+will receive pi�hlin <br /> e e <br /> seryines as part of a larger rdeyelepmen+proien+sUnh as a planned <br /> development or village flexible rdevelepmen+ <br /> /4)€xniration and Re-Approval of SUP <br /> (a) The Glass A SpeGial Use Permit, <br /> i+ if approved, q-.h.oll he valid- for sox years, <br /> but may be renewed or re-approved by the Board of County <br /> Commissioners after receiving a report from the Planning Department <br /> that the use 's and has been continuously since it was issued, in <br /> Usecompliance with provisions of the Special se Permit <br /> ;h)ThL Orange County Planning Department_ hall present its report on_ he <br /> compliance of the special use no later than 90 days before the a ra+inn <br /> of the Special Use Permit <br /> (GThe Board of County Commissioners shall not renew+he Cnenial Use <br /> Permit if it is determined that the applicant has failed to comply with+he <br /> Gonditions of approval. <br /> (d) if the Beard of County Commissioners does not renew the erm+ the <br /> ir,-crrc <br /> permit shall become null and void upon the expiration of the time limit <br /> (e) if the Special Use Permit s not renewed re-approved,or_ then_ he <br /> nlinant m submit a new application as if '+were a new use. <br /> 5.6_9Mnrbrewery with Minor Eve�180 <br /> /A\ Standards for Class Qn eGnial UsePermit or ASE_CZ or AQl_! 7 Zoning vri.tr i <br /> Cte <br /> M\ rl rdi the + Section or 7 Q n hle the following <br /> Alfa-c'�rvrt�8irt��� ii'S-Fr�-c�cG�tlt3r��. ��-��a$ c��plFP.a , <br /> i nforma+inn shall he s hmitted with the application materials: <br /> `ateDescription of special events to he held on-site including frequency of <br /> events, hours of operation anticipated attendance, d any o+he <br /> rd r <br /> pert'Rent e+ails ff'„''`-'' <br /> /h�)Lnvna+inn of overflowparking area(s) Tequired parkingis nn�RGipated <br /> to annomme date all special events <br /> / 1 A map depicAing surrounding s and the dis+anEe to residential <br /> /rd) AdeSGription of retail a aC�l need! <br /> �� F�v�-v-rT Tc $�I cr <br /> (e) A comprehensive ground <br /> water study, for facilities expected to use s�v more <br /> groundwater on an annualid basis than an average single family residence <br /> (which uses 240 gallons of water per day) built at the highest density the <br /> existing- Z ,district would allow. For example if the existing onmi g <br /> district allows a residential density of 1 unit for 7 acres and the propns er! <br /> use 's on a six acre parcel (which could yield Q residences), <br /> the <br /> proposed use(s) may use three times the water used by an average <br /> single family residence (or 720 gallons per day, on an annualized basis\ <br /> before a comprehensive groundwater sturdy is required. The water usage <br /> rated f�existing use si Chien++n zoning regula+inns Inna+ei-d on the <br /> same let shall he taken into annount when determining if a <br /> Eemprehensiye groundwater study is required. Said study shall deta.`Ir <br /> 180 Moved to the central Microbrewery use under the Manufacturing,Assembly, Processing, and Distribution Uses <br /> —Food land use category in Section 5.14.2 of the revised UDO. <br /> Orange County, North Carolina—Unified Development Ordinance Page 5-74 <br />
The URL can be used to link to this page
Your browser does not support the video tag.