Browse
Search
Agenda 04-16-2019 5-a - Attachment 7a, 7b, 7c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2019
>
Agenda - 04-16-19 Regular Meeting
>
Agenda 04-16-2019 5-a - Attachment 7a, 7b, 7c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2019 2:07:16 PM
Creation date
4/12/2019 1:49:17 PM
Metadata
Fields
Template:
BOCC
Date
4/16/2019
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda - 04-16-2019 Regular Meeting
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 04-16-19 Regular Meeting
Agenda 04-16-2019 5-a - Unified Development Ordinance (UDO) Table of Permitted Uses
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 04-16-19 Regular Meeting
Minutes 04-16-2019 Regular Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 5: Uses 155 <br /> Section 5.6: Standards for Commercial Service Uses <br /> o�Proposed hours of operation for non residential_uses of the site <br /> and within buildings thereon <br /> CcBI�'�rng plans forall existing r proposed structures to include floor <br /> plans, elevations, ,y and sections shOing restOr a+inn/rehabilita+inn <br /> proposed. <br /> (d) LandSGape plan, at the come scale a as the site plan, sheWiRg existing nr <br /> proposers trees, shrubs, rs ground ^Over and other lanscape materials <br /> (Landscape information is often shown On the base plan for small <br /> projects. Each tree does not have tobe individually identified; she yin�n <br /> arl ""eeXiStir tree lie often sufficient for large lots where the h IL of <br /> then Pert y r OOrserl \ <br /> (e)Statement from the appropriate p bloc service agencies concerning the <br /> m__.o___o+hed and adequacy of water supply and wastewater treatment for the <br /> proposed uses-. <br /> Y) Statement from the appropriate public lie service agencies concerning the <br /> nr on of fire, and rest rot ction to the site and Itr,,ctures <br /> iTG�TfQTG.7GPe�i 1'VLeGTfV1TZVZTf�i tiiRTfGf-..TLIFGTGIT�i.T <br /> (g) The proposed development SGhedule for the <br /> (h) Outdoor events /ro e.g.weddings, receptions, parties) nr similar activities <br /> cendUGted for cempensa+inn shall he permitted, ,,ff only if there is sicient <br /> overflow parking available on site. Overflow parking does not have to be <br /> paved or graveled but must be on a suitable (even) surface. <br /> Any bed &_hvreakfast inn that is nn� located on a state maintained road <br /> shall furnish a copy of the deed establishing the ingress/egress <br /> easement to the County. Such documentation shall not he limited two the <br /> easement deer! but may also include copies of road maintenance <br /> agreements as determined by the Co ntv <br /> (j) Any application for bed & breakfast inn_rep ra+inn that does no 7Glude <br /> any G-ianges to an existing strLiGture,and herefere-does not re a <br /> Certificate Of QGGUpanGY to begin operatiens, shall submit dOGurnent <br /> from the Core Marshal and Building Inspections Division that all areas <br /> open to the public meet state regulatiens <br /> /L,) Applicants requesting a full or Partial I.n ier of the rig.h+_nway land use <br /> buffer shall submit evidence that the property is lister) on the National <br /> Historic Register r zed by the State of North Carolina or the Count <br /> of (l I f h' interest Applications incorporating <br /> ngg <br /> ��=arrgcZra v--aci-npruC�.v^r-nret8l'�'^cn interest.� '-ccc.vr,r��C� <br /> historic sites shall provide a description of how the historical style and <br /> character of the building and/or property is to he enhancers through the <br /> pry <br /> (2) Standards of Evaluation <br /> fAl Proposers uses and facilities are complementary and cOmpatible with <br /> surrounding area, and appropriate On the IGGation proposed given <br /> GharaGter of surrounding clevelopment. <br /> /b�\)Fire�Oonc and rev- and water supply and wastewater <br /> treatment methods are adequate to serve the proposers uses and <br /> facilities.(c) Recreational areas, service areas, parking and screening are adequate <br /> for the proposers se(s) <br /> /rl\ The site is serried by direct access to a State maintainedrgaar� <br /> �a� �,urti� .Jcrr �y--vrrccTac <br /> e internal rvehicular and pedestrian c r'r cu,la+inn is adequate for the proposed Orange County, North Carolina—Unified Development Ordinance Page 5-70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.