Browse
Search
Agenda - 02-19-2002 - 9b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 02-19-2002
>
Agenda - 02-19-2002 - 9b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2017 11:36:30 AM
Creation date
8/29/2008 10:27:34 AM
Metadata
Fields
Template:
BOCC
Date
2/19/2002
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
9b
Document Relationships
Minutes - 20020219
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
RES-2002-013 Mill Creek II Subdivision (Section 1) Preliminary Plan
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
52 23 <br /> ....tr <br /> Orange County Health Department e a° <br /> Jonathan Klein,MD,Chair Rosemary L. Summers,MPH,DrPH lanuSoutherland,DDS, Vice-Chair c 0" <br /> x.14 e..•"'' Orange County Board ojHealth Health Director Orange County Board ojHealth <br /> Environmental Health Division <br /> Ron Holdway, Division Director <br /> 306-C Revere Road,P.O.Box 8181 Phone: (919)245-2360 FAX: (919)644-3006 <br /> Hillsborough,HC 27278 Betty Borland Barbara Stokes Chapel Hill Durham Mebane <br /> wwwco.orange.nc.us/oraneelenvhlth/ Administrative Assistant Wee Assistant (919)9684501 (919)688-7331 (919)227-2031 <br /> November 6,2001 <br /> SOIL/SITE Evaluation Summary for: <br /> Mill Creek II <br /> Cheeks Township Map 2 Lot 15 <br /> Map Date Revised November 2,2001 <br /> Lot# DESIGN FLOW SYSTEM TYPE <br /> P1 360 gpd Ultra Shallow Trench Conventional w/pump <br /> P2 360 gpd Conventional w/pump <br /> P3 360 gpd Shallow Trench Conventional <br /> P4 360 gpd Shallow Trench Conventional w/pump <br /> P5 360 gpd Shallow Trench Conventional w pump <br /> P6 360 gpd Conventional w/pump <br /> P7 360 gpd Conventional <br /> P8 360 gpd Conventional w/pump <br /> P9 360 gpd . Shallow Trench Conventional w/pump <br /> P 10 360 gpd Ultra Shallow Trench Conventional w/pump <br /> P 11 360 gpd Ultra Shallow Trench Conventional w/pump <br /> P12 360 gpd Ultra Shallow Trench Conventional w/pump <br /> NOTES: <br /> The design flow is based upon the number of bedrooms applied for by the property owner or developer. The design <br /> flow for a bedroom is 120 gallons/day(gpd). (e.g. 360 gpd=3 bedrooms) <br />
The URL can be used to link to this page
Your browser does not support the video tag.