Browse
Search
Agenda - 8-c - Approval of Budget Amendment #7-E for Repair of the District Attorney Building
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2019
>
Agenda - 04-16-19
>
Agenda - 8-c - Approval of Budget Amendment #7-E for Repair of the District Attorney Building
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2019 1:28:09 PM
Creation date
4/12/2019 1:11:06 PM
Metadata
Fields
Template:
BOCC
Date
4/16/2019
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8-c
Document Relationships
Agenda - 04-16-2019 Regular Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2019\Agenda - 04-16-19
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> ORD-2019-016 <br /> ORANGE COUNTY <br /> BOARD OF COMMISSIONERS <br /> ACTION AGENDA ITEM ABSTRACT <br /> Meeting Date: April 16, 2019 <br /> Action Agenda <br /> Item No. 8-c <br /> SUBJECT: Approval of Budget Amendment #7-E for Repair of the District Attorney Building <br /> DEPARTMENT: Asset Management Services <br /> ATTACHMENT(S): INFORMATION CONTACT: <br /> Angel Barnes, Capital Projects Manager, <br /> Budget Summary 919-245-2628 <br /> Travis Myren, Deputy County Manager, <br /> 919-245-2308 <br /> PURPOSE: To approve Budget Amendment #7-E for the repair of the District Attorney Building. <br /> BACKGROUND: The District Attorney building located at 144 East Margaret Lane in <br /> Hillsborough started having issues with water intruding through the roof and around the building <br /> into the crawl space in November 2018. As part of an investigation of the gutters and storm <br /> water drains on the west side of the building, it was discovered that a portion of the terracotta <br /> storm piping underneath the restrooms for the pavilion had collapsed. The findings also <br /> indicated that ground water underneath the building has created heavy amounts of organic <br /> growth in the crawl space that covers a large portion of the soil. Due to the humidity and <br /> seasons changing, this matter has become time sensitive in order to prevent any future moisture <br /> intrusion or organic growth into the building or entering into the HVAC equipment located within <br /> the crawl space. <br /> The scope of work includes: <br /> • Removal, cleaning and reinstallation of the downspouts. Video of the drain lines. <br /> Cleaning the gutter drains and videos to confirm cleaning is effective. <br /> • Crawlspace cleaning, remediation of soil with organic growth, install moisture barrier. <br /> • Replace damaged brick on both chimneys, including repointing and sealing the bricks. <br /> • Repair damaged terracotta drain line, waterproofing and perform site grading to move <br /> water away from the building. <br /> Since this project was not anticipated as part of the Capital Budget, a budget amendment is <br /> necessary to finance this project. This budget amendment provides for the creation of the <br /> following Capital Project Ordinance: <br />
The URL can be used to link to this page
Your browser does not support the video tag.