Browse
Search
2019-219-E AMS - ECS Southeast construction materials testing for SHSC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-219-E AMS - ECS Southeast construction materials testing for SHSC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2019 11:46:25 AM
Creation date
4/8/2019 11:21:14 AM
Metadata
Fields
Template:
Contract
Date
4/21/2019
Contract Starting Date
6/1/2019
Contract Ending Date
12/31/2020
Contract Document Type
Agreement - Services
Amount
$31,600.00
Document Relationships
R 2019-219 AMS - ECS Southeast construction materials testing for SHSC
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:34CC7277-FDAE-4FDE-B006-5BD22283431D <br /> C. <br /> 2019 ECS SOUTHEAST,LLP <br /> FEE SCHEDULE <br /> Personnel <br /> Senior Principal Engineer............................................................................................................................$200.00/hour <br /> PrincipalEngineer.......................................................................................................................................$175.00/hour <br /> Senior Professional Engineer......................................................................................................................$125.00/hour <br /> ProjectManager.........................................................................................................................................$110.00/hour <br /> Field Technician(**)...................................................................................................................................$45.00/hour <br /> Chief Materials/ICC Technician(**)...........................................................................................................$65.00/hour <br /> NCDOT Field Technician(**)......................................................................................................................$65.00/hour <br /> Senior Level AWS CWI(NDE: UT, MT, PT, RI)(**)......................................................................................$95.00/hour <br /> Administrative Support..............................................................................................................................$50.00/hour <br /> Transportation via company or private vehicle.........................................................................................$ 0.65/mile <br /> Note: Charges for engineering and technical personnel will be made for time spent in the field, in engineering <br /> analysis, in preparation of reports,and in travel portal to portal from our office. For scheduling requests <br /> received without sufficient notice as stated within the ECS proposal, services will be staffed with <br /> available personnel at the associated unit rates. <br /> (**)=Overtime=Standard Rate x 1.50 for over 8 hours per day and outside normal business hours of <br /> 7:00am to 5:00pm, holiday,Saturday,or Sunday <br /> EQUIPMENT and LABORATORY <br /> R-Meter .........................................................................................................................................................$50.00/day <br /> Coremachine.................................................................................................................................................$250.00/day <br /> GPREquipment..............................................................................................................................................$175.00/day <br /> Moisture Emission Test Kit............................................................................................................................$50.00/unit <br /> Nuclear Density and Moisture Measuring Equipment.................................................................................$45.00/day <br /> Thin Lift Nuclear Gauge.................................................................................................................................$45.00/day <br /> UltrasonicEquipment....................................................................................................................................$100.00/day <br /> Dipstick .........................................................................................................................................................$150.00/day <br /> Asphalt Bulk Specific Gravity.........................................................................................................................$75.00 each <br /> WindsorProbe Gun.......................................................................................................................................$125.00/day <br /> WindsorProbe Shots.....................................................................................................................................$75.00/shot <br /> Standard Proctor(ASTM D-698)....................................................................................................................$130.00 each <br /> Modified Proctor(ASTM D-1557)4 inch mold..............................................................................................$140.00 each <br /> Atterberg Limits Testing................................................................................................................................$65.00 each <br /> Wash 200 Sieve Analysis................................................................................................................................$45.00 each <br /> Testing of Cylinders, Prisms,Cubes and Core Specimens: <br /> Compressive Strength of grout prisms(3.5"x3.5"x7")......................................................................$ 18.00 each <br /> Compressive strength of mortar cubes..........................................................................................$10.00 each <br /> Compressive strength of concrete cylinders including reserves,(ASTM C-39).............................$10.00 each <br /> Core Specimen(including sample preparation).............................................................................$25.00/test <br /> Extra Molds-cylinder molds included in compressive strength rate(per case of 30) $65.00/case <br /> Note: The above charges will be made for tests and equipment operated by ECS SOUTHEAST, LLP personnel in <br /> addition to personnel charges already listed.Soil Samples requiring a turnaround time of less than 5 days will <br /> be billed at 1.5 times the test unit rate. <br />
The URL can be used to link to this page
Your browser does not support the video tag.