Browse
Search
2019-219-E AMS - ECS Southeast construction materials testing for SHSC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-219-E AMS - ECS Southeast construction materials testing for SHSC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2019 11:46:25 AM
Creation date
4/8/2019 11:21:14 AM
Metadata
Fields
Template:
Contract
Date
4/21/2019
Contract Starting Date
6/1/2019
Contract Ending Date
12/31/2020
Contract Document Type
Agreement - Services
Amount
$31,600.00
Document Relationships
R 2019-219 AMS - ECS Southeast construction materials testing for SHSC
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:34CC7277-FDAE-4FDE-B006-5BD22283431D <br /> March 22, 2019 ECS SOUTHEAST, LLP <br /> FEE ESTIMATE <br /> CONSTRUCTION MATERIALS TESTING AND SPECIAL INSPECTION SERVICES <br /> Southern Campus Expansion - Raleigh, North Carolina <br /> ECS Proposal No. 06:21261 <br /> Field Services: Quantity Unit Rate Cost <br /> Field Technician: <br /> Earthwork 25 visits @ 8 hours/visit 200 hours @ $45.00/ hour $9,000.00 <br /> Foundation Bearing 6 visits @ 4 hours/visit 24 hours @ $45.00/ hour $1,080.00 <br /> Foundation Concrete 6 visits @ 4 hours/visit 24 hours @ $45.00/ hour $1,080.00 <br /> Slab-on-grade Concrete 5 visits @ 8 hours/visit 40 hours @ $45.00/ hour $1,800.00 <br /> Pavement Subgrades 2 visits @ 6 hours/visit 12 hours @ $45.00/ hour $540.00 <br /> Pavement Observations 5 visits @ 8 hours/visit 40 hours @ $45.00/hour $1,800.00 <br /> Sample Pickups 2 visits @ 2 hours/visit 4 hours @ $45.00 /hour $180.00 <br /> ICC Inspector/Staff Engineer: <br /> Reinforcing Steel Obser 8 visits @ 2 hours/visit 16 hours @ $65.00/hour $1,040.00 <br /> Masonry Inspections 2 visits @ 4 hours/visit 8 hours @ $65.00/ hour $520.00 <br /> Wood Framing 3 visits @ 3 hours/visit 9 hours @ $65.00/hour $585.00 <br /> Structural Steel 4 visits @ 3 hours/visit 12 hours @ $95.00/ hour $1,140.00 <br /> Project Manager: <br /> Site Meetings/Obser. 4 visits @ 3 hours/visit 12 hours @ $110.00/ hour $1,320.00 <br /> Mileage(round trip): 72 visits @ 36 miles/visit 2592 miles @ $0.65/ mile $1,684.80 <br /> Subtotal:Field Services :0 <br /> Laboratory Testing: Quantity Unit Rate Cost <br /> Standard Proctor, Atterberg Limits, Wash 200: 2 samples @ $250.00/sample $500.00 <br /> Compressive Strength of Concrete Cylinders: 72 cylinders @ $10.00/cylinder $720.00 <br /> Comp. Strength of Grout Specimen: 6 samples @ $18.00/prism $108.00 <br /> Comp. Strength of Masonry 6 samples @ $10.00/cube $60.00 <br /> Subtotal:Laboratory Testing 00 <br /> Equipment Expenses: Quantity Unit Rate Cost <br /> Nuclear Density Gauge: 30 day(s) @ $45.00/day $1,350.00 <br /> Dipstick: day(s) @ $150.00/day $0.00 <br /> Equipment00 <br /> Project Management/Report Review: Quantity Unit Rate Cost <br /> Principal Engineer: 84 reports @ 0.25 hours/report 21 hours @ $175.00/ hour $3,675.00 <br /> Project Manager: 84 reports @ 0.25 hours/report 21 hours @ $110.00/ hour $2,310.00 <br /> Secretary: 84 reports @ 0.25 hours/report 21 hours @ $50.00 / hour $1,050.00 <br /> Project Management Subtotal: 00 <br /> TOTALESTIMATED • : 1 <br /> ECS Proposal 06:21261 <br /> Page 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.