Browse
Search
2019-219-E AMS - ECS Southeast construction materials testing for SHSC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-219-E AMS - ECS Southeast construction materials testing for SHSC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2019 11:46:25 AM
Creation date
4/8/2019 11:21:14 AM
Metadata
Fields
Template:
Contract
Date
4/21/2019
Contract Starting Date
6/1/2019
Contract Ending Date
12/31/2020
Contract Document Type
Agreement - Services
Amount
$31,600.00
Document Relationships
R 2019-219 AMS - ECS Southeast construction materials testing for SHSC
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:34CC7277-FDAE-4FDE-B006-5BD22283431D <br /> ECS SOUTHEAST, LLP <br /> Communications <br /> To expedite the timely distribution of our daily reports, our field personnel utilize wireless hand-held <br /> technology to collect, process, and return data to our Raleigh office. Our use of this powerful <br /> technology typically facilitates electronic distribution of our reports within approximately 24 hours. This <br /> enhanced reporting technology allows us to simultaneously communicate our testing data with all <br /> project team members. <br /> We anticipate our services will be needed on a full-time basis during earthwork and foundation <br /> installation and typically on an on-call basis thereafter. The appropriate contractor or owner <br /> representative should contact our scheduling coordinator to provide the appropriate level of staffing <br /> to meet the project requirements; the direct phone number is 919-861-9830.All scheduling requests <br /> must be made 24 hours in advance so that the proper personnel may be scheduled for the required <br /> inspection task. Each scheduling request will be assigned a work order number so that the scheduled <br /> testing and inspection is documented. We also ask that we be provided with one full set of up-to-date <br /> project drawings and specifications prior to starting work on this project. <br /> ECS will transmit reports by e-mail. Please list those to whom the reports should be sent and provide <br /> their e-mail on the attached Proposal Acceptance Form. <br /> FEES/COST OF SERVICES <br /> Based upon the scope of services and our fee schedule, ECS estimates that our services for this project <br /> will be on the order of $31,542.80. A cost estimate is attached. ECS will invoice Orange County Asset <br /> Mgmt. & Purchasing for our services on a unit-rate basis in accordance with the unit rates provided in <br /> the attached Project Fee Schedule. Invoices will be submitted on a monthly basis—typically on or about <br /> the 10th day of each month. <br /> Our estimated cost provided does not constitute a lump-sum or not-to-exceed price for our services. <br /> Additional visits, re-inspections and unanticipated scopes of services may be required and will be <br /> invoiced in accordance with the attached fee schedule. <br /> At the time of this proposal, a construction schedule was not available and this cost estimate is based on <br /> our assumption of the construction schedule considering the construction drawings and specifications <br /> provided. The actual cost may be more or less than our cost estimate and will depend on the duration <br /> of construction and the frequency of testing scheduled by the general contractor. Should a defined <br /> construction schedule and detailed scope of services become available, we would be happy to prepare a <br /> more defined cost estimate. Should the construction schedule change and/or change in the scope of <br /> services differ from the proposed schedule or supplied schedule and scopes, our estimate will be revised <br /> utilizing the enclosed unit rates within this proposal. ECS will invoice only the actual costs of services <br /> expended. <br /> AUTHORIZATION <br /> If the scope of work as outlined above and the attached Terms and Conditions are acceptable to you, <br /> please sign the attached Proposal Acceptance Form on behalf of Orange County Asset Mgmt. & <br /> Purchasing and return one copy of the Proposal Acceptance Form to ECS. Please note that the attached <br /> Terms and Conditions of Service are incorporated herein by reference and are an integral part of this <br /> agreement between us. <br /> ECS Proposal 06:21261 <br /> Pagel 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.