Orange County NC Website
DocuSign Envelope ID:34CC7277-FDAE-4FDE-B006-5BD22283431D <br /> ECS SOUTHEAST, LLP <br /> • Continuous observation of fill placement activities for conformance with the project <br /> geotechnical report. <br /> • Perform in-place density testing of fill materials to verify the percent compaction/in-place dry <br /> density is in compliance with the project geotechnical report. <br /> Shallow Foundations—Chapter 17,Section 1704.9 <br /> • Periodic inspections and testing by Dynamic Cone Penetrometer of soils at footing bearing level to <br /> verify that the soils encountered are satisfactory for the allowable design pressure recommended. <br /> • Periodic observations and documentation of reinforcing steel. <br /> Concrete—Chapter 17,Section 1704.2 and 4 <br /> • Collect and review concrete batch tickets to confirm compliance with the approved mix <br /> design(s). <br /> • Observe reinforcing steel prior to concrete placement to confirm bar size, grade of steel, lap <br /> splices, clearances, support methods, and cleanliness. <br /> • Anchor bolts shall be observed prior to concrete placement to confirm proper placement and <br /> embedment. <br /> • Document general curing procedures. <br /> • If extreme weather conditions are apparent, document that hot or cold weather procedures are <br /> followed <br /> • Visually check the concrete in each truck as it arrives on site for proper slump and observe general <br /> placement procedures. <br /> • Sample and test plastic concrete to include slump tests,air content, unit weight of lightweight <br /> concrete, and temperature. <br /> • Make and cure 4.0 inch by 8.0 inch concrete cylinder test specimens for compressive strength <br /> testing per specifications. (two 7-day breaks,three 28-day breaks,and one reserve) <br /> • Deliver test specimens to ECS' laboratory within 24 hours after casting. <br /> • Laboratory curing, compressive strength testing and report of concrete cylinder test specimens. <br /> • ICC reinforced concrete inspector to observe reinforcing steel. <br /> Wood Construction—Chapter 17,Section 1704.6 <br /> • Verify that the fabricator maintains detailed fabrication and quality control procedures that <br /> provide a basis for inspection control of the workmanship and fabricator's ability to conform to <br /> approved construction documents and referenced standards. <br /> • Review the procedures for completeness and adequacy relative to the code requirements for <br /> the fabricator's scope of work. <br /> • Verify any wood structural panel sheathing to ascertain whether it is the grade and thickness <br /> shown on the approved building plans. <br /> • Verify the nominal size of framing members at adjoining panel edges,the nail or staple diameter <br /> and length,the number of fastener lines and that spacing between fasteners in each line and at <br /> edge margins agrees with the approved building plans. <br /> ECS Proposal 06:21261 <br /> Page 13 <br />