Browse
Search
2019-219-E AMS - ECS Southeast construction materials testing for SHSC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-219-E AMS - ECS Southeast construction materials testing for SHSC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2019 11:46:25 AM
Creation date
4/8/2019 11:21:14 AM
Metadata
Fields
Template:
Contract
Date
4/21/2019
Contract Starting Date
6/1/2019
Contract Ending Date
12/31/2020
Contract Document Type
Agreement - Services
Amount
$31,600.00
Document Relationships
R 2019-219 AMS - ECS Southeast construction materials testing for SHSC
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:34CC7277-FDAE-4FDE-B006-5BD22283431D <br /> ECS SOUTHEAST, LLP <br /> • Continuous observation of fill placement activities for conformance with the project <br /> geotechnical report. <br /> • Perform in-place density testing of fill materials to verify the percent compaction/in-place dry <br /> density is in compliance with the project geotechnical report. <br /> Shallow Foundations—Chapter 17,Section 1704.9 <br /> • Periodic inspections and testing by Dynamic Cone Penetrometer of soils at footing bearing level to <br /> verify that the soils encountered are satisfactory for the allowable design pressure recommended. <br /> • Periodic observations and documentation of reinforcing steel. <br /> Concrete—Chapter 17,Section 1704.2 and 4 <br /> • Collect and review concrete batch tickets to confirm compliance with the approved mix <br /> design(s). <br /> • Observe reinforcing steel prior to concrete placement to confirm bar size, grade of steel, lap <br /> splices, clearances, support methods, and cleanliness. <br /> • Anchor bolts shall be observed prior to concrete placement to confirm proper placement and <br /> embedment. <br /> • Document general curing procedures. <br /> • If extreme weather conditions are apparent, document that hot or cold weather procedures are <br /> followed <br /> • Visually check the concrete in each truck as it arrives on site for proper slump and observe general <br /> placement procedures. <br /> • Sample and test plastic concrete to include slump tests,air content, unit weight of lightweight <br /> concrete, and temperature. <br /> • Make and cure 4.0 inch by 8.0 inch concrete cylinder test specimens for compressive strength <br /> testing per specifications. (two 7-day breaks,three 28-day breaks,and one reserve) <br /> • Deliver test specimens to ECS' laboratory within 24 hours after casting. <br /> • Laboratory curing, compressive strength testing and report of concrete cylinder test specimens. <br /> • ICC reinforced concrete inspector to observe reinforcing steel. <br /> Wood Construction—Chapter 17,Section 1704.6 <br /> • Verify that the fabricator maintains detailed fabrication and quality control procedures that <br /> provide a basis for inspection control of the workmanship and fabricator's ability to conform to <br /> approved construction documents and referenced standards. <br /> • Review the procedures for completeness and adequacy relative to the code requirements for <br /> the fabricator's scope of work. <br /> • Verify any wood structural panel sheathing to ascertain whether it is the grade and thickness <br /> shown on the approved building plans. <br /> • Verify the nominal size of framing members at adjoining panel edges,the nail or staple diameter <br /> and length,the number of fastener lines and that spacing between fasteners in each line and at <br /> edge margins agrees with the approved building plans. <br /> ECS Proposal 06:21261 <br /> Page 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.