Browse
Search
2019-201-E IT - NWN Corporation exchange upgrade
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-201-E IT - NWN Corporation exchange upgrade
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2019 11:40:06 AM
Creation date
4/5/2019 11:20:42 AM
Metadata
Fields
Template:
Contract
Date
3/30/2019
Contract Starting Date
3/31/2019
Contract Ending Date
12/31/2019
Contract Document Type
Agreement - Services
Amount
$24,600.00
Document Relationships
R 2019-201 IT - NWN Corporation exchange upgrade
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:61B0186F-FC84-4AEA-A28C-BF187CFEC9D1 <br /> Orange County Government <br /> Exchange 2016 Upgrade 14,11A <br /> Project#OP132913/r1.0 <br /> ■ Functionality testing procedures—NWN will discuss with the customer their plan for performing testing <br /> after the upgrade has been completed. This will be used during the Execute Phase of the project. <br /> ■ Finalize delivery schedule <br /> ■ GATE REVIEW: Design Acceptance.—NWN will conduct a design review and acceptance session with the <br /> customer to review the design details prior to initiating any production implementation or changes. The <br /> customer's acceptance of the design is the approval to move forward in the project. <br /> Deliverables: <br /> ■ Design & Planning Meeting <br /> ■ Detailed Upgrade documents <br /> ■ Upgrade Design acceptance meeting <br /> 3 — Prepare Phase <br /> The phase details activities that are required to prepare and make the environment ready for the upgrade. <br /> Activities in this phase of the project include: <br /> ■ NWN will verify all existing servers and software are at the required version to perform the upgrades <br /> ■ NWN will verify that required resources existing (CPU, Memory, Disk space) in the environment to <br /> accommodate the Exchange servers <br /> ■ NWN will work with customer to obtain required software installs and licenses <br /> Deliverables: <br /> ■ Current Exchange environment is at the correct service pack/patch level for the upgrade/migration <br /> ■ Install files and licenses are available for the new servers <br /> 4 - Execute Phase <br /> This is the main delivery phase of the project. Activities in this phase of the project include: <br /> ■ NWN will create a Windows Server 2016 virtual machine template on the Nutanix cluster <br /> ■ NWN will create three(3) new Windows Server 2016 virtual machines to host the new mail servers from <br /> template <br /> ■ NWN will install the Microsoft Exchange 2016 software and patch (as required) <br /> ■ NWN will create the storage environment for the database server consisting of volumes for mailbox DBs, <br /> replication logs, etc <br /> www.NWNIT.com Page 8 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.