Browse
Search
ORD-2019-013 Approval of a Contract and Budget Amendment #7-C for Repair and Reconstruction of the Government Services Annex Building
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2010-2019
>
2019
>
ORD-2019-013 Approval of a Contract and Budget Amendment #7-C for Repair and Reconstruction of the Government Services Annex Building
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2019 10:01:23 AM
Creation date
4/3/2019 4:35:44 PM
Metadata
Fields
Template:
BOCC
Date
4/2/2019
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
8h
Document Relationships
Agenda 04-02-2019 8-h - Approval of a Contract and Budget Amendment #7-C for Repair and Reconstruction of the Government Services Annex Building
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 04-02-19 Regular Meeting
Minutes 04-02-2019 Regular Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13 <br /> Board of Elections Water Mitigation Scope of Work Descriptions&Details <br /> 8. During the remediation all of the attic walls, and existing insulation was removed. This allowed <br /> the brick chimneys to be exposed to the interior of the attic. The chimneys currently need to be <br /> repointed due to water entering through the bricks. Currently the insulation installed needs to be <br /> removed and replaced. The area must be cleaned to remove any mold growth from the water <br /> intrusion around all four chimneys. <br /> 9. Sealing of basement doors and installing new maintenance access door <br /> 10. Cleaning of data cabling to remove unused cables and securing existing cables. <br /> Construction Costs: <br /> HVAC Controls, Programming, Additional Unit, temporary units 155,000 <br /> Clean out interior drains in basement 1,313 <br /> Moisture Barrier/Humidifers 24,394 <br /> Stairwell removal and install floor 10,434 <br /> Remediation at each Chimney 1,466 <br /> Chimney Repairs 30,200 <br /> Replace windows NTE 105,000 <br /> Replace carpet, seal basement from first floor, abatement 61,969 <br /> Rework furniture for carpet installation &replace NTE 25,000 <br /> Rework and remove unused data cables from basement NTE 16,000 <br /> Seal Basement doors and install new higher access NTE 125,000 <br /> 555,776 <br />
The URL can be used to link to this page
Your browser does not support the video tag.