Browse
Search
2019-193-E AMS - Sasser Companies ES remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-193-E AMS - Sasser Companies ES remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 9:07:31 AM
Creation date
3/29/2019 9:19:27 AM
Metadata
Fields
Template:
Contract
Date
3/20/2019
Contract Starting Date
3/20/2019
Contract Ending Date
8/8/2019
Contract Document Type
Agreement - Construction
Agenda Item
3/19/19; 8-i
Amount
$1,499,409.00
Document Relationships
2019-408-E AMS - Sasser Change Request 1 drywall removal
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-480-E AMS - Sasser Companies mechanical system replacement contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-918-E AMS - Sasser ES Change Request 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2020-068-E AMS - Sasser Companies ES panel install contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
Agenda - 03-19-2019 8-i - Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 03-19-19 Regular Meeting
R 2019-193 AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> SECTION 01 23 00-ALTERNATES <br /> PART 1 -GENERAL <br /> 1.1 SUMMARY <br /> A. This Section includes administrative and procedural requirements for alternates. <br /> 1.2 DEFINITIONS <br /> A. Alternate:An amount proposed by bidders and stated on the Bid Form for certain work defined in the Bidding Require- <br /> ments that may be added to or deducted from the Base Bid amount if Owner decides to accept a corresponding change <br /> either in the amount of construction to be completed or in the products, materials, equipment, systems, or installation <br /> methods described in the Contract Documents. <br /> 1. The cost or credit for each alternate is the net addition to or deduction from the Contract Sum to incorporate <br /> alternate into the Work. No other adjustments are made to the Contract Sum. <br /> 1.3 PROCEDURES <br /> A. Coordination: Modify or adjust affected adjacent work as necessary to completely integrate work of the alternate into <br /> Project. <br /> 1. Include as part of each alternate, miscellaneous devices, accessory objects, and similar items incidental to or <br /> required for a complete installation whether or not indicated as part of alternate. <br /> B. Notification: Immediately following award of the Contract, notify each party involved, in writing, of the status of each <br /> alternate. Indicate if alternates have been accepted, rejected, or deferred for later consideration. Include a complete <br /> description of negotiated modifications to alternates. <br /> C. Execute accepted alternates under the same conditions as other work of the Contract. <br /> D. Schedule:A Schedule of Alternates is included at the end of this Section.Specification Sections referenced in schedule <br /> contain requirements for materials necessary to achieve the work described under each alternate. <br /> PART 2-PRODUCTS(Not Used) <br /> PART 3-EXECUTION <br /> 3.1 SCHEDULE OF ALTERNATES <br /> A. Alternate No. 1: State an alternate price to provide Owner's preferred brand mechanical system components by <br /> Mitsubishi as described in the documents. <br /> END OF SECTION 01 23 00 <br /> ©BOOMERANG DESIGN #1835 01 23 00-1 510 Meadowlands Drive, Hillsborough, NC <br /> ORANGE COUNTY,NC 12/07/2018 <br /> Addendum#1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.