Browse
Search
2019-193-E AMS - Sasser Companies ES remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-193-E AMS - Sasser Companies ES remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 9:07:31 AM
Creation date
3/29/2019 9:19:27 AM
Metadata
Fields
Template:
Contract
Date
3/20/2019
Contract Starting Date
3/20/2019
Contract Ending Date
8/8/2019
Contract Document Type
Agreement - Construction
Agenda Item
3/19/19; 8-i
Amount
$1,499,409.00
Document Relationships
2019-408-E AMS - Sasser Change Request 1 drywall removal
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-480-E AMS - Sasser Companies mechanical system replacement contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-918-E AMS - Sasser ES Change Request 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2020-068-E AMS - Sasser Companies ES panel install contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
Agenda - 03-19-2019 8-i - Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 03-19-19 Regular Meeting
R 2019-193 AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> Pre-bid conference <br /> #1835 510 Meadowlands <br /> 01/03/19 <br /> Page 2 of 3 <br /> • "Minority Business Participation Guidelines" (goal of 10%or more) <br /> o You must include you minority participation you will utilize on this project. Refer to the following <br /> forms located in your specifications/project manual. <br /> ■ "Identification of Minority Business Participation"form <br /> ■ "State of North Carolina Affidavit A—Listing of the Good Faith Effort." <br /> ■ "State of North Carolina Affidavit B— Intent to Perform Contract with Own Workforce." <br /> o Alternates: <br /> ■ Alt. No 1: Mitsubishi Mechanical System Components <br /> o Allowances and Unit Prices: <br /> ■ Remove and replace existing sealant and backing material at CMU masonry wall <br /> control/expansion joints <br /> ■ Remove sealant applied to cracks in CMU and cracks in CMU masonry joints. <br /> ■ Cut-out/rout cracks in CMU and install backer material and sealant. <br /> ■ Cut-out/rout existing mortar and repoint CMU masonry joints. <br /> ■ Remove and replace Split-faced CMU block. <br /> ■ Cleaning of exterior CMU masonry surfaces. <br /> ■ Application of water repellant to exterior CMU masonry surfaces. <br /> ■ Surface preparation and application of primer and coating to sheet metal surface. <br /> ■ Surface preparation and application of 2-inch width pre-manufactured silicone strip at metal <br /> joints. <br /> ■ Surface preparation and application of 1" wide bond breaker tape centered over joints and <br /> application of high-performance high-build polyether-fluid-applied flashing membrane 3" wide <br /> centered over the tape and gutter joints. <br /> ■ Fabrication and installation of 24 gauge Kynar/Hylar based fluoropolymer coated sheet metal. <br /> ■ Provide and install stainless steel hex head screw with stainless steel washers with neoprene <br /> gasket backing. <br /> ■ Provide and install TPO roof walk pad. <br /> Standard Documents <br /> • "General Conditions of the Contract"-Section 00 72 00. <br /> • Permits have been applied for by Orange County. <br /> Project Overview <br /> • Base Scope of Work—Section 0100 00 "Summary." &Construction Documents <br /> • The Work includes: <br /> o Selective demolition of drywall, insulation, windows, HVAC,flashings and trims. <br /> o Provide exterior masonry restoration on North, South and West Elevations. <br /> o Provide sealant removal and replacement at masonry wall control joints, at wall expansion joints, at <br /> masonry to door frame joints and at wall penetrations on North, South and West Elevations. <br /> o Provide application of a high-performance hydrophobic silane sealer to all exterior masonry surfaces. <br /> o New Aluminum storefront windows and new security screens. <br /> o Spray foam insulation with air barrier. <br /> o Reworking flashings, mortar joints, sealing cmu. <br /> o Carpet Tile, resilient flooring, base and accessories. <br /> o Acoustical ceiling panels. Paint. <br /> o Heating, ventilating and air conditioning work. <br /> o Electrical and plumbing work associated with HVAC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.