Orange County NC Website
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> ADDENDUM NO. ONE <br /> to boomerang <br /> Contract Documents for D E S I G !v <br /> rethink,repurpose,resells <br /> 510 MEADOWLANDS DRIVE REMEDIATION <br /> AND RENOVATION <br /> Date: January 10, 2019 <br /> NOTICE TO BIDDERS: <br /> The addendum serves to clarify, revise, and supersede information in the Drawings and Addenda (if any), <br /> which have previously been issued. <br /> Bidders shall acknowledge receipt of this Addendum in the appropriate space on the Bid Form. <br /> General: <br /> 1. Pre Bid Conference—Refer to the attached sign-in sheet for contractors in attendance as well as the <br /> meeting minutes from the meeting. Note, only those general contractors who attended the Pre-Bid <br /> Conference will be allowed to bid on this project. <br /> 2. Clarification on Bonding—The General Contractor will be required to provide the required bonding <br /> for the project. <br /> 3. The building's existing fire alarm vendor is First Fire (formerly Apex Fire). <br /> Specifications: <br /> 1. 00 1113 Bid Ad—replace the bid ad in the specifications with the ad that ran in the paper. <br /> 2. 00 42 13 Bid Form—replace the bid form with that attached. Bidders will be required to identify <br /> their remediation company that holds the IICRC Certificate. Note that those listed on the bid form <br /> must be whom the general contractor contract with (no substitutions after bidding). <br /> 3. 00 42 23 Bid Form Supplement Alternates—add the alternates form for attachment to your bid. <br /> 4. 00 43 93 Information Available to Bidders—replace the Information Available to Bidders checklist. <br /> 5. 0123 00 Alternates—add the attached alternates section. <br /> 6. 09 65 19 Resilient Tile Flooring—replace this section. Static dissipative carpet requirements have <br /> been added/revised. <br /> 7. 09 68 13 Tile Carpeting—replace this section. VCT 2 has been removed. <br /> 8. Specification 08 4114—Security Screen, Item 2.2.D: Delete 2.2.D.2. Only the wire cloth will be <br /> required as listed in 2.2.D.1 and 2.2.D.1.a. <br /> Drawings: <br /> 1. Clarification of GSA storage compliance—The awarded contractor will be required to contract with <br /> GSA certified movers to move all contents off site for remediation. Once the contents are cleaned, <br /> the GSA certified movers will move the equipment to a GSA certified storage facility. Once the <br /> BOOMERANG DESIGN#1835 <br />