Browse
Search
2019-193-E AMS - Sasser Companies ES remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-193-E AMS - Sasser Companies ES remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 9:07:31 AM
Creation date
3/29/2019 9:19:27 AM
Metadata
Fields
Template:
Contract
Date
3/20/2019
Contract Starting Date
3/20/2019
Contract Ending Date
8/8/2019
Contract Document Type
Agreement - Construction
Agenda Item
3/19/19; 8-i
Amount
$1,499,409.00
Document Relationships
2019-408-E AMS - Sasser Change Request 1 drywall removal
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-480-E AMS - Sasser Companies mechanical system replacement contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-918-E AMS - Sasser ES Change Request 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2020-068-E AMS - Sasser Companies ES panel install contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
Agenda - 03-19-2019 8-i - Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 03-19-19 Regular Meeting
R 2019-193 AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> Orange County Emergency Services Building Construction Documents <br /> SECTION 23 31 16 <br /> EXTERIOR PRE-MANUFACTURED PRE-INSULATED DUCTS <br /> PART 1 -GENERAL <br /> 1.01 SUMMARY <br /> A. When pressure/leakage testing is known to be necessary, the ductwork system shall be designed <br /> to the testing pressure. <br /> B. The contractor shall include for the manufacture, fabrication, supply, delivery and installation of <br /> materials necessary for the ductwork systems described in this specification. <br /> C. All materials and finishes shall be free from defects and maintained in good condition throughout <br /> the duration of the works. <br /> D. The materials used in the fabrication of ductwork shall be from the duct system manufacturer and <br /> shall be suitable for continuous use throughout the range of operating temperatures and within the <br /> environment indicated. <br /> E. The fabrication and installation of the ductwork system shall be carried out by certified fabricators <br /> and installers that have successfully completed specialist training courses provided by aqc, <br /> industries. <br /> 1.02 SYSTEM DESCRIPTION <br /> A. Double layered, double wall, pre-insulated, weatherproof outdoor duct system designed for a xterior <br /> application. Inter-locking, quadruple sealing joint system to ensure minimal leakage and superior <br /> panel jacketing ensures the maximum in protection from the elements. <br /> B. Suitable for use in the following exterior applications: exterior supply, return, fresh air and general <br /> exhaust ductwork and has two thicknesses available. <br /> C. R-12 <br /> 1.03 SUBMITTALS <br /> A. Shop drawings: cad-generated showing fabrication and installation details for all ducts to include. <br /> B. Isometric view of duct assembly with duct sections indicated on drawing to match part number <br /> tagging on delivered duct sections. <br /> C. Fabrication and assembly instructions. <br /> D. Details for connecting to other components (i.e. curbs, rooftop units, mechanical room walls, etc.) <br /> E. Duct layout indicating sizes and pressure classes. <br /> F. Elevations of top and bottom of ducts. <br /> G. Dimensions of main duct runs from building grid lines. <br /> H. Reinforcement and spacing. <br /> I. Seam and joint construction. <br /> J. Equipment installation based on equipment being used on project. <br /> K. Duct accessories, including access doors and panels. <br /> L. Field quality-control test reports. <br /> 1.04 STANDARDS/REFERNCES <br /> A. American standards: ASTM C 518 2004 <br /> B. Standard test methods for water vapor transmission of materials: ASTM E 84-08a <br /> C. Standard test method for surface burning characteristics of building materials: UL 723 <br /> D. Test for surface burning characteristics of building materials: NFPA 90A <br /> E. Standard for the installation of air conditioning and ventilating systems: NFPA 90B <br /> F. Standard for the installation of warm air heating and air-conditioning systems: UL 181 <br /> G. SMACNA HVAC phenolic duct construction standards <br /> PDC Project 18102 EXTERIOR 2331 16- 1 <br /> 12/17/2018 PRE-MANUFACTURED <br /> PRE-INSULATED DUCTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.