Browse
Search
2019-193-E AMS - Sasser Companies ES remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-193-E AMS - Sasser Companies ES remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 9:07:31 AM
Creation date
3/29/2019 9:19:27 AM
Metadata
Fields
Template:
Contract
Date
3/20/2019
Contract Starting Date
3/20/2019
Contract Ending Date
8/8/2019
Contract Document Type
Agreement - Construction
Agenda Item
3/19/19; 8-i
Amount
$1,499,409.00
Document Relationships
2019-408-E AMS - Sasser Change Request 1 drywall removal
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-480-E AMS - Sasser Companies mechanical system replacement contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-918-E AMS - Sasser ES Change Request 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2020-068-E AMS - Sasser Companies ES panel install contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
Agenda - 03-19-2019 8-i - Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 03-19-19 Regular Meeting
R 2019-193 AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> Orange County Emergency Services Building Construction Documents <br /> SECTION 23 31 00 <br /> HVAC DUCTS AND CASINGS <br /> PART 1 GENERAL <br /> 1.01 SECTION INCLUDES <br /> A. Metal ductwork. <br /> 1.02 REFERENCE STANDARDS <br /> A. ASTM A36/A36M - Standard Specification for Carbon Structural Steel; 2014. <br /> B. ASTM A653/A653M - Standard Specification for Steel Sheet, Zinc-Coated (Galvanized)or Zinc-Iron <br /> Alloy-Coated (Galvannealed) by the Hot-Dip Process; 2017. <br /> C. ASTM E84- Standard Test Method for Surface Burning Characteristics of Building Materials; 2018. <br /> D. ICC-ES AC01 -Acceptance Criteria for Expansion Anchors in Masonry Elements; 2015. <br /> E. ICC-ES AC106-Acceptance Criteria for Predrilled Fasteners (Screw Anchors) in Masonry <br /> Elements; 2015. <br /> F. ICC-ES AC193-Acceptance Criteria for Mechanical Anchors in Concrete Elements; 2015. <br /> G. ICC-ES AC308-Acceptance Criteria for Post-Installed Adhesive Anchors in Concrete Elements; <br /> 2016. <br /> H. NFPA 90A- Standard for the Installation of Air-Conditioning and Ventilating Systems; 2018. <br /> I. SMACNA (DCS)- HVAC Duct Construction Standards Metal and Flexible; 2005 (Revised 2009). <br /> J. SMACNA(LEAK)- HVAC Air Duct Leakage Test Manual; 2012. <br /> K. UL 181 - Standard for Factory-Made Air Ducts and Air Connectors; current edition, including all <br /> revisions. <br /> 1.03 SUBMITTALS <br /> A. Product Data: Provide data for duct materials and duct connections. <br /> B. Shop Drawings: Indicate duct fittings, particulars such as gages, sizes, welds, and configuration <br /> prior to start of work for 1/2" pressure class and higher systems. <br /> C. Test Reports: Indicate pressure tests performed. Include date, section tested, test pressure, and <br /> leakage rate, following SMACNA(LEAK). <br /> 1.04 QUALITY ASSURANCE <br /> A. Manufacturer Qualifications: Company specializing in manufacturing the type of products specified <br /> in this section, with minimum three years of documented experience, and approved by <br /> manufacturer. <br /> 1.05 FIELD CONDITIONS <br /> A. Do not install duct sealants when temperatures are less than those recommended by sealant <br /> manufacturers. <br /> B. Maintain temperatures within acceptable range during and after installation of duct sealants. <br /> PART 2 PRODUCTS <br /> 2.01 DUCT ASSEMBLIES <br /> A. Regulatory Requirements: Construct ductwork to NFPA 90A standards. <br /> B. Ducts: Galvanized steel, unless otherwise indicated. <br /> C. Low Pressure Supply(Heating Systems): 2 inch w.g. pressure class, galvanized steel. <br /> D. Low Pressure Supply(System with Cooling Coils): 2 inch w.g. pressure class, galvanized steel. <br /> E. Medium and High Pressure Supply: 6 inch w.g. pressure class, galvanized steel. <br /> F. Return and Relief: 2 inch w.g. pressure class, galvanized steel. <br /> G. General Exhaust: 2 inch w.g. pressure class, galvanized steel. <br /> H. Outside Air Intake: 2 inch w.g. pressure class, galvanized steel. <br /> I. Combustion Air: 1 inch w.g. pressure class, galvanized steel. <br /> PDC Project 18102 HVAC DUCTS AND CASINGS 2331 00- 1 <br /> 12/17/2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.