Browse
Search
2019-193-E AMS - Sasser Companies ES remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-193-E AMS - Sasser Companies ES remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 9:07:31 AM
Creation date
3/29/2019 9:19:27 AM
Metadata
Fields
Template:
Contract
Date
3/20/2019
Contract Starting Date
3/20/2019
Contract Ending Date
8/8/2019
Contract Document Type
Agreement - Construction
Agenda Item
3/19/19; 8-i
Amount
$1,499,409.00
Document Relationships
2019-408-E AMS - Sasser Change Request 1 drywall removal
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-480-E AMS - Sasser Companies mechanical system replacement contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-918-E AMS - Sasser ES Change Request 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2020-068-E AMS - Sasser Companies ES panel install contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
Agenda - 03-19-2019 8-i - Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 03-19-19 Regular Meeting
R 2019-193 AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> Orange County Emergency Services Building Construction Documents <br /> C. Startup Reports, Prefunctional Checklists, and Trend Logs: Submit for approval of Commissioning <br /> Authority. <br /> D. HVAC Control System O&M Manual Requirements. In addition to documentation specified <br /> elsewhere, compile and organize at minimum the following data on the control system: <br /> 1. Specific step-by-step instructions on how to perform and apply all functions, features, modes, <br /> etc. mentioned in the controls training sections of this specification and other features of this <br /> system. Provide an index and clear table of contents. Include the detailed technical manual <br /> for programming and customizing control loops and algorithms. <br /> 2. Full as-built set of control drawings. <br /> 3. Full as-built sequence of operations for each piece of equipment. <br /> 4. Full points list; in addition to the information on the original points list submittal, include a <br /> listing of all rooms with the following information for each room: <br /> a. Floor. <br /> b. Room number. <br /> c. Room name. <br /> d. Air handler unit ID. <br /> e. Reference drawing number. <br /> f. Air terminal unit tag ID. <br /> g. Heating and/or cooling valve tag ID. <br /> h. Minimum air flow rate. <br /> i. Maximum air flow rate. <br /> 5. Full print out of all schedules and set points after testing and acceptance of the system. <br /> 6. Full as-built print out of software program. <br /> 7. Electronic copy on disk of the entire program for this facility. <br /> 8. Marking of all system sensors and thermostats on the as-built floor plan and HVAC drawings <br /> with their control system designations. <br /> 9. Maintenance instructions, including sensor calibration requirements and methods by sensor <br /> type, etc. <br /> 10. Control equipment component submittals, parts lists, etc. <br /> 11. Warranty requirements. <br /> 12. Copies of all checkout tests and calibrations performed by the Contractor(not commissioning <br /> tests). <br /> 13. Organize and subdivide the manual with permanently labeled tabs for each of the following <br /> data in the given order: <br /> a. Sequences of operation. <br /> b. Control drawings. <br /> c. Points lists. <br /> d. Controller and/or module data. <br /> e. Thermostats and timers. <br /> f. Dampers and damper actuators. <br /> g. Program setups (software program printouts). <br /> E. Draft Training Plan: In addition to requirements specified in Section 01 79 00, include: <br /> 1. Follow the recommendations of ASHRAE Guideline 1.1. <br /> 2. Control system manufacturer's recommended training. <br /> 3. Demonstration and instruction on function and overrides of any local packaged controls not <br /> controlled by the HVAC control system. <br /> PART 2 PRODUCTS <br /> 2.01 TEST EQUIPMENT <br /> A. Provide all standard testing equipment required to perform startup and initial checkout and required <br /> functional performance testing; unless otherwise noted such testing equipment will NOT become <br /> the property of Owner. <br /> B. Equipment-Specific Tools: Where special testing equipment, tools and instruments are specific to <br /> a piece of equipment, are only available from the vendor, and are required in order to accomplish <br /> startup or Functional Testing, provide such equipment, tools, and instruments as part of the work at <br /> PDC Project 18102 COMMISSIONING OF HVAC 23 08 00-2 <br /> 12/17/2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.