Browse
Search
2019-193-E AMS - Sasser Companies ES remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-193-E AMS - Sasser Companies ES remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 9:07:31 AM
Creation date
3/29/2019 9:19:27 AM
Metadata
Fields
Template:
Contract
Date
3/20/2019
Contract Starting Date
3/20/2019
Contract Ending Date
8/8/2019
Contract Document Type
Agreement - Construction
Agenda Item
3/19/19; 8-i
Amount
$1,499,409.00
Document Relationships
2019-408-E AMS - Sasser Change Request 1 drywall removal
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-480-E AMS - Sasser Companies mechanical system replacement contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-918-E AMS - Sasser ES Change Request 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2020-068-E AMS - Sasser Companies ES panel install contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
Agenda - 03-19-2019 8-i - Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 03-19-19 Regular Meeting
R 2019-193 AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> Orange County Emergency Services Building Construction Documents <br /> PART 3 EXECUTION <br /> 3.01 EXAMINATION <br /> A. Verify that ducts have been tested before applying insulation materials. <br /> B. Verify that surfaces are clean, foreign material removed, and dry. <br /> 3.02 INSTALLATION <br /> A. Install in accordance with manufacturer's instructions. <br /> B. Insulated ducts conveying air below ambient temperature: <br /> 1. Provide insulation with vapor barrier jackets. <br /> 2. Finish with tape and vapor barrier jacket. <br /> C. Ducts Exposed in Mechanical Equipment Rooms or Finished Spaces: Finish with canvas jacket <br /> sized for finish painting or white PVC jacket. <br /> D. Exterior Applications: Provide insulation with vapor barrier jacket. Provide rigid board insulation <br /> and cover with with calked aluminum jacket with seams located on bottom side of horizontal duct <br /> section. <br /> E. External Duct Insulation Application: <br /> 1. Secure insulation with vapor barrier with wires and seal jacket joints with vapor barrier <br /> adhesive or tape to match jacket. <br /> 2. Install without sag on underside of duct. Use adhesive or mechanical fasteners where <br /> necessary to prevent sagging. Lift duct off trapeze hangers and insert spacers. <br /> 3. Stop and point insulation around access doors and damper operators to allow operation <br /> without disturbing wrapping. <br /> 3.03 SCHEDULES <br /> A. All supply, outside air, and return air ductwork shall be completely insulated, unless otherwise <br /> noted on the plans. Insulation shall completely cover flexible connections. Insulation shall be <br /> minimum 3.0 inch thick. <br /> B. All insulation within the building envelope, except in the attic (where applicable), shall have a <br /> minimum R-value of 6.0 based on installed thickness. Any insulation wrap or board installed <br /> outside the building envelope or in an attic, shall have a minimum R-value of 8.0 based on installed <br /> thickness. <br /> C. Exhaust and relief air ductwork does not require insulation, unless otherwise noted on the plans. <br /> END OF SECTION 23 07 13 <br /> PDC Project 18102 DUCT INSULATION 23 07 13 - 3 <br /> 12/17/2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.