Browse
Search
2019-193-E AMS - Sasser Companies ES remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-193-E AMS - Sasser Companies ES remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 9:07:31 AM
Creation date
3/29/2019 9:19:27 AM
Metadata
Fields
Template:
Contract
Date
3/20/2019
Contract Starting Date
3/20/2019
Contract Ending Date
8/8/2019
Contract Document Type
Agreement - Construction
Agenda Item
3/19/19; 8-i
Amount
$1,499,409.00
Document Relationships
2019-408-E AMS - Sasser Change Request 1 drywall removal
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-480-E AMS - Sasser Companies mechanical system replacement contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-918-E AMS - Sasser ES Change Request 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2020-068-E AMS - Sasser Companies ES panel install contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
Agenda - 03-19-2019 8-i - Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 03-19-19 Regular Meeting
R 2019-193 AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> Orange County Emergency Services Building Construction Documents <br /> B. Control System Coordination Reports: Communicate in writing to the controls installer all setpoint <br /> and parameter changes made or problems and discrepancies identified during TAB that affect, or <br /> could affect, the control system setup and operation. <br /> C. Final Report: Indicate deficiencies in systems that would prevent proper testing, adjusting, and <br /> balancing of systems and equipment to achieve specified performance. <br /> 1. Revise TAB plan to reflect actual procedures and submit as part of final report. <br /> 2. Submit draft copies of report for review prior to final acceptance of Project. Provide final <br /> copies for Architect and for inclusion in operating and maintenance manuals. <br /> 3. Provide reports in soft cover, letter size, 3-ring binder manuals, complete with index page and <br /> indexing tabs, with cover identification at front and side. Include set of reduced drawings with <br /> air outlets and equipment identified to correspond with data sheets, and indicating thermostat <br /> locations. The Final Report shall be placed in and become a part of the Maintenance and <br /> Operations Manuals (4 copies). <br /> 4. Include actual instrument list, with manufacturer name, serial number, and date of calibration. <br /> 5. Form of Test Reports: Where the TAB standard being followed recommends a report format <br /> use that; otherwise, follow ASHRAE Std 111. <br /> 6. Units of Measure: Report data in I-P (inch-pound) units only. <br /> 7. Include the following on the title page of each report: <br /> a. Name of Testing, Adjusting, and Balancing Agency. <br /> b. Address of Testing, Adjusting, and Balancing Agency. <br /> c. Telephone number of Testing, Adjusting, and Balancing Agency. <br /> d. Also include a certification sheet containing the seal and name, address, telephone <br /> number, and signature of the Certified Test and Balance Engineer. Include in this division <br /> a listing of the instruments used for the procedures along with proof of calibration. <br /> D. Project Record Documents: Record actual locations of flow measuring stations and balancing <br /> valves and rough setting. <br /> PART 2 PRODUCTS -NOT USED <br /> PART 3 EXECUTION <br /> 3.01 GENERAL REQUIREMENTS <br /> A. Perform total system balance in accordance with one of the following: <br /> 1. AABC (NSTSB), AABC National Standards for Total System Balance. <br /> B. Begin work after completion of systems to be tested, adjusted, or balanced and complete work <br /> prior to Substantial Completion of the project. <br /> C. Where HVAC systems and/or components interface with life safety systems, including fire and <br /> smoke detection, alarm, and control, coordinate scheduling and testing and inspection procedures <br /> with the authorities having jurisdiction. <br /> D. TAB Agency Qualifications: <br /> 1. Company specializing in the testing, adjusting, and balancing of systems specified in this <br /> section. <br /> 2. Having minimum of three years documented experience. <br /> 3. Certified by one of the following: <br /> a. AABC, Associated Air Balance Council: www.aabc.com/#sle; upon completion submit <br /> AABC National Performance Guaranty. <br /> b. NEBB, National Environmental Balancing Bureau: www.nebb.org/#sle. <br /> E. TAB Supervisor Qualifications: Professional Engineer licensed in the State in which the Project is <br /> located. <br /> 3.02 EXAMINATION <br /> A. Verify that systems are complete and operable before commencing work. Ensure the following <br /> conditions: <br /> 1. Systems are started and operating in a safe and normal condition. <br /> 2. Temperature control systems are installed complete and operable. <br /> 3. Proper thermal overload protection is in place for electrical equipment. <br /> PDC Project 18102 TESTING, ADJUSTING, AND 23 05 93- 2 <br /> 12/17/2018 BALANCING FOR HVAC <br />
The URL can be used to link to this page
Your browser does not support the video tag.