Browse
Search
2019-193-E AMS - Sasser Companies ES remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-193-E AMS - Sasser Companies ES remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 9:07:31 AM
Creation date
3/29/2019 9:19:27 AM
Metadata
Fields
Template:
Contract
Date
3/20/2019
Contract Starting Date
3/20/2019
Contract Ending Date
8/8/2019
Contract Document Type
Agreement - Construction
Agenda Item
3/19/19; 8-i
Amount
$1,499,409.00
Document Relationships
2019-408-E AMS - Sasser Change Request 1 drywall removal
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-480-E AMS - Sasser Companies mechanical system replacement contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-918-E AMS - Sasser ES Change Request 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2020-068-E AMS - Sasser Companies ES panel install contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
Agenda - 03-19-2019 8-i - Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 03-19-19 Regular Meeting
R 2019-193 AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> Orange County Emergency Services Building Construction Documents <br /> 1. Fuel Gas Yellow <br /> 2. Refrigerant Orange <br /> D. Install plastic pipe markers in accordance with manufacturer's instructions. <br /> E. Install plastic tape pipe markers complete around pipe in accordance with manufacturer's <br /> instructions. <br /> F. Use tags on piping 3/4 inch diameter and smaller. <br /> 1. Identify service, flow direction, and pressure. <br /> 2. Install in clear view and align with axis of piping. <br /> 3. Locate identification not to exceed 20 feet on straight runs including risers and drops, adjacent <br /> to each valve and Tee, at each side of penetration of structure or enclosure, and at each <br /> obstruction. <br /> G. Install ductwork with stencilled painting. Identify with air handling unit identification number and <br /> area served. Identify service (supply, return, exhaust, outside air, etc.) Locate identification at air <br /> handling unit, at each side of penetration of structure or enclosure, and at each obstruction. <br /> H. Locate ceiling tacks to locate valves or dampers above lay-in panel ceilings. Locate in corner of <br /> panel closest to equipment. <br /> I. Identify control panels, manual motor starters, combination motor starters, disconnects, variable <br /> frequency drives, boiler override switches, boiler emergency switches, and major control <br /> components outside panels with plastic nameplates. <br /> J. Identify thermostats or temperature sensors relating to air handling units or valves with labels. <br /> K. Identify valves in main and branch piping with valve labels. <br /> L. Tag automatic controls, instruments, and relays. Key to control schematic. <br /> M. Identify air handling units with plastic nameplates indicating unit number, area served, OEM and <br /> external static pressure, based on actual equipment submittal data, number and size of filters, and <br /> number and size of belts (where applicable). <br /> N. Provide ceiling track markers to locate valves or dampers above T-bar type panel ceilings. Locate <br /> in corner of panel closest to equipment. Markers shall be installed prior to request for above ceiling <br /> inspection. <br /> 3.03 SCHEDULE <br /> A. Standard Color Identification for Mechanical Piping (all labels shall be provided with flow arrows): <br /> 1. Fuel Gas Piping Black Lettering/Yellow Background <br /> 2. Condensate Drain Black Lettering/White Background <br /> 3. Refrigerant Black Lettering/Yellow Background <br /> END OF SECTION 23 05 53 <br /> PDC Project 18102 IDENTIFICATION FOR HVAC 23 05 53-3 <br /> 12/17/2018 PIPING AND EQUIPMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.