Browse
Search
2019-193-E AMS - Sasser Companies ES remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-193-E AMS - Sasser Companies ES remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 9:07:31 AM
Creation date
3/29/2019 9:19:27 AM
Metadata
Fields
Template:
Contract
Date
3/20/2019
Contract Starting Date
3/20/2019
Contract Ending Date
8/8/2019
Contract Document Type
Agreement - Construction
Agenda Item
3/19/19; 8-i
Amount
$1,499,409.00
Document Relationships
2019-408-E AMS - Sasser Change Request 1 drywall removal
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-480-E AMS - Sasser Companies mechanical system replacement contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-918-E AMS - Sasser ES Change Request 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2020-068-E AMS - Sasser Companies ES panel install contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
Agenda - 03-19-2019 8-i - Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 03-19-19 Regular Meeting
R 2019-193 AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> Orange County Emergency Services Building Construction Documents <br /> SECTION 23 05 13 <br /> COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT <br /> PART 1 GENERAL <br /> 1.01 SECTION INCLUDES <br /> A. General construction and requirements. <br /> B. Applications. <br /> C. Single phase electric motors. <br /> D. Three phase electric motors. <br /> E. Electronically Commutated Motors (ECM). <br /> 1.02 REFERENCE STANDARDS <br /> A. ABMA STD 9- Load Ratings and Fatigue Life for Ball Bearings; 2015. <br /> B. IEEE 112- IEEE Standard Test Procedure for Polyphase Induction Motors and Generators; 2004. <br /> C. NEMA MG 1 - Motors and Generators; 2017. <br /> D. NFPA 70 - National Electrical Code; Most Recent Edition Adopted by Authority Having Jurisdiction, <br /> Including All Applicable Amendments and Supplements. <br /> 1.03 SUBMITTALS <br /> A. Product Data: Provide wiring diagrams with electrical characteristics and connection requirements. <br /> B. Manufacturer's Installation Instructions: Indicate setting, mechanical connections, lubrication, and <br /> wiring instructions. <br /> C. Maintenance Data: Include assembly drawings, bearing data including replacement sizes, and <br /> lubrication instructions. <br /> 1.04 QUALITY ASSURANCE <br /> A. Conform to NFPA 70. <br /> B. Provide certificate of compliance from Authority Having Jurisdiction indicating approval of high <br /> efficiency motors. <br /> C. Products Requiring Electrical Connection: Listed and classified by Underwriters Laboratories Inc. <br /> as suitable for the purpose specified and indicated. <br /> 1.05 DELIVERY, STORAGE, AND HANDLING <br /> A. Protect motors stored on site from weather and moisture by maintaining factory covers and suitable <br /> weather-proof covering. For extended outdoor storage, remove motors from equipment and store <br /> separately. <br /> PART 2 PRODUCTS <br /> 2.01 MANUFACTURERS <br /> A. Baldor Electric Company/ABB Group: www.baldor.com. <br /> B. General Electric <br /> C. Marathon <br /> 2.02 GENERAL CONSTRUCTION AND REQUIREMENTS <br /> A. Electrical Service: <br /> 1. Motors 3/4 HP and Smaller: 115 volts, single phase, 60 Hz. <br /> 2. Motors Larger than 3/4 Horsepower: 208/480 volts, three phase, 60 Hz as indicated on the <br /> Drawings. <br /> B. Nominal Efficiency: <br /> 1. All motors shall be premium efficiency and meet or exceed the requirements of ASHRAE <br /> Standard 90.1-2013 and the North Carolina Energy Code. <br /> 2. All motors shall conform to the efficiency standard for integral horsepower motors known as <br /> 10 CFR Part 431 Subpart B published by the US Department of Energy. <br /> PDC Project 18102 COMMON MOTOR 23 05 13- 1 <br /> 12/17/2018 REQUIREMENTS FOR HVAC <br /> EQUIPMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.