Browse
Search
2019-193-E AMS - Sasser Companies ES remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-193-E AMS - Sasser Companies ES remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 9:07:31 AM
Creation date
3/29/2019 9:19:27 AM
Metadata
Fields
Template:
Contract
Date
3/20/2019
Contract Starting Date
3/20/2019
Contract Ending Date
8/8/2019
Contract Document Type
Agreement - Construction
Agenda Item
3/19/19; 8-i
Amount
$1,499,409.00
Document Relationships
2019-408-E AMS - Sasser Change Request 1 drywall removal
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-480-E AMS - Sasser Companies mechanical system replacement contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-918-E AMS - Sasser ES Change Request 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2020-068-E AMS - Sasser Companies ES panel install contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
Agenda - 03-19-2019 8-i - Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 03-19-19 Regular Meeting
R 2019-193 AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> Orange County Emergency Services Building Construction Documents <br /> SECTION 23 05 12 <br /> ELECTRICAL WORK <br /> PART 1 GENERAL <br /> 1.01 DIVISION OF WORK <br /> A. This Contractor shall be responsible for the final electrical and the entire control connections and <br /> wiring to all equipment installed as part of his contract. <br /> B. Contractor shall review the electrical plans, where applicable, to establish points of connection and <br /> the extent of his electrical work to be provided in his contract. <br /> C. Unless otherwise noted, this Contractor shall wire from his equipment to disconnect switches, <br /> junction boxes, or panelboard circuit breakers as provided by the Electrical Contractor or as <br /> required by the existing conditions. <br /> D. All power and control wiring shall be in conduits. Refer to electrical specifications for conduit and <br /> conduit fittings. <br /> E. All electrical work shall be performed by a licensed electrician. <br /> F. All electrical work shall be in accordance with the State Building Code and all its supplements, the <br /> latest edition of the National Electrical Code and the electrical specifications. <br /> PART 2 PRODUCT <br /> 2.01 GENERAL REQUIREMENTS <br /> A. All motor starters, disconnects, switches, relays, conduits, conductors, etc. that are required for a <br /> complete electrical power and/or control system shall conform to the requirements set forth by <br /> NEC. <br /> B. Refer to the plans for the type, size and electrical characteristics of the starters, disconnects, <br /> switches, relays, conductor and conduits. <br /> C. All conductors and conduits shall be sized as noted on the plans or As required per NEC. <br /> D. All individual motor starters for mechanical equipment (i.e., fans, pumps, etc.) shall be furnished <br /> and installed under Division 23. <br /> E. All relays, actuators, timers, seven-day clocks, alternators, pressure, vacuum, float, flow, <br /> pneumatic-electric, and electric-pneumatic switches, aquastats, freezestats, line and low voltage <br /> thermostats, thermals, remote selector switches, remote push-button stations, emergency <br /> break-glass stations, interlocking, disconnect switches beyond termination point, and other <br /> appurtenances associated with equipment under Division 23 shall be furnished, installed and wired <br /> under Division 23. <br /> PART 3 EXECUTION <br /> 3.01 GENERAL REQUIREMENTS <br /> A. All motor starters, disconnects, and switches shall be installed on or as close to the equipment they <br /> are serving as possible, or where shown on the plans. <br /> B. Electrical connection to equipment subject to vibration which develops objectionable noises shall <br /> be made from the conduit system with short lengths of flexible "Liquid-Tite" conduit. Connection to <br /> other equipment shall be made with rigid conduit. <br /> C. Conduits shall be run in a concealed space such as wall cavities, ceiling cavities, etc. except in the <br /> mechanical rooms where conduit may be run exposed. <br /> END OF SECTION 23 05 12 <br /> PDC Project 18102 ELECTRICAL WORK 23 05 12 - 1 <br /> 12/17/2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.