Browse
Search
2019-193-E AMS - Sasser Companies ES remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-193-E AMS - Sasser Companies ES remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 9:07:31 AM
Creation date
3/29/2019 9:19:27 AM
Metadata
Fields
Template:
Contract
Date
3/20/2019
Contract Starting Date
3/20/2019
Contract Ending Date
8/8/2019
Contract Document Type
Agreement - Construction
Agenda Item
3/19/19; 8-i
Amount
$1,499,409.00
Document Relationships
2019-408-E AMS - Sasser Change Request 1 drywall removal
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-480-E AMS - Sasser Companies mechanical system replacement contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-778-E AMS - Sasser Companies Inc ES remediation amendment 3
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-918-E AMS - Sasser ES Change Request 4
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2020-068-E AMS - Sasser Companies ES panel install contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
Agenda - 03-19-2019 8-i - Approval of a Construction Contract for the Remediation, Repair, and Reconstruction of the Phillip Nick Waters Emergency Services Building
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 03-19-19 Regular Meeting
R 2019-193 AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B94F2D40-3B3C-47A7-86C2-6F1 B4F92C62C <br /> Orange County Emergency Services Building Construction Documents <br /> SECTION 23 01 30.51 <br /> HVAC AIR-DISTRIBUTION SYSTEM CLEANING <br /> PART 1 GENERAL <br /> 1.01 SECTION INCLUDES <br /> A. Cleaning of HVAC duct system, equipment, and related components. <br /> 1.02 DEFINITIONS <br /> A. HVAC System: For purposes of this section, the surfaces to be cleaned include all interior surfaces <br /> of the heating, air-conditioning, and ventilation system from the points where the air enters the <br /> system to the points where the air is discharged from the system, including the inside of air <br /> distribution equipment, coils, and condensate drain pans; see NADCA ACR for more details. <br /> 1. Above-ceiling plenum for supply air is required to be cleaned. <br /> 2. Above-ceiling plenum for return air is required to be cleaned. <br /> 3. Makeup air system is required to be cleaned. <br /> 4. Exhaust-only system is required to be cleaned. <br /> 1.03 REFERENCE STANDARDS <br /> A. ASTM E84 - Standard Test Method for Surface Burning Characteristics of Building Materials; 2018. <br /> B. NADCA ACR-Assessment, Cleaning and Restoration of HVAC Systems; 2013. <br /> C. NAIMA- Standard AH122 - Cleaning Fibrous Glass Insulated Duct(Ductboard / Duct Board) <br /> Systems. <br /> D. UL 181 - Standard for Factory-Made Air Ducts and Air Connectors; current edition, including all <br /> revisions. <br /> E. UL 181A- Closure Systems for Use with Rigid Air Ducts; Current Edition, Including All Revisions. <br /> 1.04 SUBMITTALS <br /> A. Product Data: Manufacturer's data sheets on each product to be used. <br /> B. Qualifications Statement: Submit qualifications of proposed cleaning contractor for approval. <br /> C. Project Cleanliness Evaluation and Cleaning Plan, as specified. <br /> D. Material Safety Data Sheets (MSDS): For all chemical products proposed to be used in the <br /> cleaning process; submit directly to Owner. <br /> E. Project Closeout Report: Include field quality control reports, evidence of satisfactory cleaning, and <br /> documentation of items needing further repair. <br /> 1.05 QUALITY ASSURANCE <br /> A. Information Available to Contractor: Upon request, Owner will provide the following: <br /> 1. One copy of original construction drawings of HVAC system. <br /> B. Cleaning Contractor Qualifications: Company specializing in the cleaning and restoration of HVAC <br /> systems as specified in this section. <br /> 1. Certified by one of the following: <br /> a. NADCA, National Air Duct Cleaners Association: www.nadca.com <br /> 2. Having minimum of five years documented experience. <br /> 3. Employing for this project a supervisor certified as an Air Systems Cleaning Specialist by <br /> NADCA. <br /> PART 2 PRODUCTS <br /> 2.01 TOOLS AND EQUIPMENT <br /> A. Vacuum Devices and Other Tools: Exceptionally clean, in good working order, and sealed when <br /> brought into the facility. <br /> B. Vacuum Devices That Exhaust Air Inside Building, Including Hand-Held and Wet Vacuums: <br /> Equipped with HEPA filtration with 99.97 percent collection efficiency for minimum 0.3-micron size <br /> particles and DOP test number. <br /> PDC Project 18102 HVAC AIR-DISTRIBUTION 23 01 30.51 - 1 <br /> 12/17/2018 SYSTEM CLEANING <br />
The URL can be used to link to this page
Your browser does not support the video tag.